Burj Khalifa (Arabic: برج خليفة), known as Burj Dubai prior to its inauguration, is a supertall skyscraper in Dubai, United Arab Emirates, and is the tallest man-made structure in the world, at 829.8 m (2,722 ft).[3][8]
Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010,[1][9] and is part of the new 2 km2 (490-acre) development called Downtown Dubai at the 'First Interchange' along Sheikh Zayed Road, near Dubai's main business district. The tower's architecture and engineering were performed by Skidmore, Owings and Merrill of Chicago, with Adrian Smith as chief architect, and Bill Baker as chief structural engineer.[10][11] The primary contractor was Samsung C&T of South Korea.[12]
In March 2009, Mohamed Ali Alabbar, chairman of the project's developer, Emaar Properties, said office space pricing at Burj Khalifa reached US$4,000 per sq ft (over US$43,000 per m²) and the Armani Residences, also in Burj Khalifa, sold for US$3,500 per sq ft (over US$37,500 per m²).[13] He estimated the total cost for the project to be about US$1.5 billion.[2]
The project's completion coincided with the global financial crisis of 2007–2012, and with vast overbuilding in the country; this led to high vacancies and foreclosures.[14] With Dubai mired in debt from its huge ambitions, the government was forced to seek multibillion dollar bailouts from its oil-rich neighbor Abu Dhabi. Subsequently, in a surprise move at its opening ceremony, the tower was renamed Burj Khalifa, said to honour the UAE President Khalifa bin Zayed Al Nahyan for his crucial support.[15][8]
Due to the slumping demand in Dubai's property market, the rents in the Burj Khalifa plummeted 40% some ten months after its opening. Out of 900 apartments in the tower, 825 were still empty at that time.[16][17] By October 2012, Emaar reported that around 80% of the apartments were occupied.[18]The tower was constructed by South Korean company, Samsung Engineering & Construction, which also did work on the Petronas Twin Towers and Taipei 101.[88] Samsung Engineering & Construction built the tower in a joint venture with Besix from Belgium and Arabtec from UAE. Turner is the Project Manager on the main construction contract.[89]
Under UAE law, the Contractor and the Engineer of Record, Hyder Consulting, is jointly and severally liable for the performance of Burj Khalifa.
The primary structure is reinforced concrete. Putzmeister created a new, super high-pressure trailer concrete pump, the BSA 14000 SHP-D, for this project.[24] Over 45,000 m3 (58,900 cu yd) of concrete, weighing more than 110,000 tonnes (120,000 short tons; 110,000 long tons) were used to construct the concrete and steel foundation, which features 192 piles; each pile is 1.5 metre diameter x 43 m long, buried more than 50 m (164 ft) deep.[25] Burj Khalifa's construction used 330,000 m3 (431,600 cu yd) of concrete and 55,000 tonnes (61,000 short tons; 54,000 long tons) of steel rebar, and construction took 22 million man-hours.[10] A high density, low permeability concrete was used in the foundations of Burj Khalifa. A cathodic protection system under the mat is used to minimize any detrimental effects from corrosive chemicals in local ground water.[49] In May 2008 Putzmeister pumped concrete to a then world record delivery height of 606 m (1,988 ft),[24] the 156th floor. Three tower cranes were used during construction of the uppermost levels, each capable of lifting a 25-tonne load.[90] The remaining structure above is constructed of lighter steel.
Burj Khalifa is highly compartmentalised. Pressurized, air-conditioned refuge floors are located approximately every 35 floors where people can shelter on their long walk down to safety in case of an emergency or fire.[49][91]
Special mixes of concrete are made to withstand the extreme pressures of the massive building weight; as is typical with reinforced concrete construction, each batch of concrete used was tested to ensure it could withstand certain pressures. CTLGroup, working for SOM, conducted the creep and shrinkage testing critical for the structural analysis of the building.[92]
The consistency of the concrete used in the project was essential. It was difficult to create a concrete that could withstand both the thousands of tonnes bearing down on it and Persian Gulf temperatures that can reach 50 °C (122 °F). To combat this problem, the concrete was not poured during the day. Instead, during the summer months ice was added to the mixture and it was poured at night when the air is cooler and the humidity is higher. A cooler concrete mixture cures evenly throughout and is therefore less likely to set too quickly and crack. Any significant cracks could have put the entire project in jeopardy.
The unique design and engineering challenges of building Burj Khalifa have been featured in a number of television documentaries, including the Big, Bigger, Biggest series on the National Geographic and Five channels, and the Mega Builders series on the Discovery Channel.
monuments
Saturday, December 15, 2012
Monday, November 12, 2012

The Space Needle is a tower in Seattle, Washington and a major landmark of the Pacific Northwest region of the United States and a symbol of Seattle. Located at the Seattle Center, it was built for the 1962 World's Fair, during which time nearly 20,000 people a day used the elevators, with over 2.3 million visitors in all for the World Fair. The Space Needle is 605 feet (184 m) high at its highest point and 138 feet (42 m) wide at its widest point and weighs 9,550 tons. When it was completed it was the tallest structure west of the Mississippi River.[5] It is built to withstand winds of up to 200 miles per hour (89 m/s) and earthquakes of up to 9.1 magnitude,[6] which would protect the structure against an earthquake as powerful as the 1700 Cascadia earthquake. The tower also has 25 lightning rods on its roof to prevent lightning damage.The Space Needle features an observation deck at 520 feet (160 m), and a gift shop with the rotating SkyCity restaurant at 500 feet (150 m).[5] From the top of the Needle, one can see not only the Downtown Seattle skyline, but also the Olympic and Cascade Mountains, Mount Rainier, Mount Baker, Elliott Bay and surrounding islands. Photographs of the Seattle skyline often show the Space Needle in a prominent position, even appearing to tower above the rest of the city's skyscrapers, as well as Mount Rainier in the background. This occurs because the tower, which is equivalent in height to a 60-story building, stands more than a kilometer northwest of most downtown skyscrapers.
Visitors can reach the top of the Space Needle via elevators that travel at 10 miles per hour (4.5 m/s). The trip takes 41 seconds, and some tourists wait in hour-long lines in order to ascend to the top of the tower. On windy days, the elevators are slowed down to a speed of 5 miles per hour (2.2 m/s). The Space Needle was designated a historic landmark on April 19, 1999, by the City's Landmarks Preservation Board.[5][7] Edward E. Carlson, chairman of the 1962 World's Fair in Seattle, originally had an idea for erecting a tower with a restaurant at the World's Fair. Carlson was then president of a hotel company and not previously known for art or design, but he was inspired by a recent visit to the Stuttgart Tower of Germany.
John Graham, an architect who had won praise for designing Northgate Mall in Seattle soon became involved. Graham's first move was to make the restaurant featured in the plans revolve, in the same manner as a tower he had previously designed for the Ala Moana Shopping Center in Honolulu.
The proposed Space Needle had no land on which to be built. Since it was not financed by the city, land had to be purchased that was within the fairgrounds. The investors thought that there would be no land available to build a tower and the search for a site was nearly dead when, in 1961, they discovered a plot, 120 by 120 feet (37 by 37 m), containing switching equipment for the fire and police alarm systems. The land sold for $75,000. At this point, only one year remained before the World's Fair would begin.
It was privately built and financed by the "Pentagram Corporation" which consisted of Bagley Wright, contractor Howard S. Wright, architect John Graham, Ned Skinner, and Norton Clapp. In 1977 Bagley, Skinner and Clapp sold their interest to Howard Wright who now controls it under the name of Space Needle Corporation.[11]
The earthquake stability of the Space Needle was ensured when a hole was dug 30 feet (9.1 m) deep and 120 feet (37 m) across, and 467 concrete trucks took one full day to fill it. The foundation weighs 5850 tons, including 250 tons of reinforcing steel. With this concrete base weighing the same as the above-ground structure, the Needle's center of gravity is just 5 feet (1.5 m) above ground level. The structure is bolted to the foundation with 72 bolts, each one 30 feet (9.1 m) long.
With time an issue, the construction team worked around the clock. The domed top, housing the top five levels (including the restaurants and observation deck), was perfectly balanced so that the restaurant could rotate with the help of one tiny electric motor, originally 0.8 kilowatts (1.1 hp), later replaced with a 1.1 kilowatts (1.5 hp) motor. With paint colors named Orbital Olive for the body, Astronaut White for the legs, Re-entry Red for the saucer, and Galaxy Gold for the roof, the Space Needle was finished in less than one year. It was completed in April 1962 at a cost of $4.5 million. The last elevator car was installed the day before the Fair opened on April 21. During the course of the Fair nearly 20,000 people a day rode the elevators to the Observation Deck. The 20,000 mark was never reached, missed by fewer than 50 people one day. At the time of construction, it was the tallest building in the West, taking the title from the Smith Tower across town that had held that title since 1914.
During the World's Fair, an imitation carillon was installed in the Space Needle, and played several times a day. The carillon recreated the tones of a total of 538 bells, and was built by the Schulmerich Company under the name "Carillon Americana". The operator's console was located in the base of the Space Needle, completely enclosed in glass to allow observation of the musician playing the instrument. It was also capable of being played from a roll, just as a player piano would be. The stentors of the carillon were located in the bottom part of the disc, and were audible over the entire fairgrounds, and beyond.[12]
In 1974, author Stephen Cosgrove's children's book Wheedle on the Needle postulated a furry creature called a Wheedle who lived on top of the Space Needle and caused its light to flash. Its closing quatrain is: There's a Wheedle on the Needle/I know just what you're thinking/But if you look up late at night/You'll see his red nose blinking. The Wheedle had since become a fixture of Seattle, becoming for a time the mascot of the Seattle SuperSonics who played in nearby Key Arena (originally The Coliseum), before departing for Oklahoma City.
In 1982, the SkyLine level was added at a height of 100 feet (30 m). While this level had been depicted in the original plans for the Space Needle, it was not built until this time. Today, the SkyLine Banquet Facility can accommodate groups of 20–360 people.
Renovations were completed in 2000 that cost nearly five times the original price ($21 million). Renovations between 1999 and 2000 included the SkyCity restaurant, SpaceBase retail store, Skybeam installation, Observation Deck overhaul, lighting additions and repainting.
In 2000, celebrations and a fireworks show were canceled because of perceived terror threats against the structure.
On May 19, 2007, the Space Needle welcomed its 45 millionth visitor. The guest, Greg Novoa of San Francisco, received a free trip for two to Paris which included a VIP dinner at the Eiffel Tower.[13]
Every year on New Year's Eve, the Space Needle celebrates with a fireworks show at midnight that is synchronized to music. The 2007/2008 show stopped, restarted, then stopped again with the rest of the pyrotechnics needing to be detonated by hand. The pyrotechnics crew blamed the problem on a corrupted file in the customized software they use to control the timed detonations.[14]
In May 2008, the Space Needle received its first professional cleaning since the opening of the 1962 World's Fair. The monument was pressure washed by Kärcher[15] with water at a pressure of 20,000 kilopascals (2,900 psi) and a temperature of 90 °C (194 °F). No detergents were used in consideration of the Seattle Center and the EMP building.[16]As part of the celebration of its 50th anniversary, the Needle was painted "Galaxy Gold" in April 2012, the same color used when the needle was originally constructed for the 1962 World's Fair.[17] This temporary makeover, intended to last through the summer, is not the Needle's first: it had the University of Washington Huskies football team logo after the team won the 1992 Rose Bowl, appeared as a giant "Wheel of Fortune" in the late 1990s, was painted crimson after Washington State won the Apple Cup,[18] and has been seen in Seattle SuperSonics colors.

Its name "CN" originally referred to Canadian National, the railway company that built the tower. Following the railway's decision to divest non-core freight railway assets, prior to the company's privatization in 1995, it transferred the tower to the Canada Lands Company, a federal Crown corporation responsible for real estate development. Since the name CN Tower became common in daily usage, the abbreviation was eventually expanded to Canadian National Tower or Canada's National Tower. However, neither of these names is commonly used.[9]
In 1995, the CN Tower was declared one of the modern Seven Wonders of the World by the American Society of Civil Engineers. It also belongs to the World Federation of Great Towers, where it holds second-place ranking.
Monday, November 5, 2012
Griffith Observatory is in Los Angeles, California. Sitting on the south-facing slope of Mount Hollywood in L.A.'s Griffith Park, it commands a view of the Los Angeles Basin, including Downtown Los Angeles to the southeast, Hollywood to the south, and the Pacific Ocean to the southwest. The observatory is a popular tourist attraction with an extensive array of space and science-related displays.
View from a trail in Griffith Park from the south, looking north.
3,015 acres (12.20 km2) of land surrounding the observatory was donated to the City of Los Angeles by Colonel Griffith J. Griffith on December 16, 1896.[1] In his will Griffith donated funds to build an observatory, exhibit hall, and planetarium on the donated land. As a Works Progress Administration (WPA) project,[2] construction began on June 20, 1933, using a design developed by architect John C. Austin based on preliminary sketches by Russell W. Porter.[1] The observatory and accompanying exhibits were opened to the public on May 14, 1935. In its first five days of operation the observatory logged more than 13,000 visitors. Dinsmore Alter was the museum's director during its first years; today, Dr. Ed Krupp is the director of the Observatory.The first exhibit visitors encountered in 1935 was the Foucault pendulum, which was designed to demonstrate the rotation of the Earth.[3] The exhibits also included a twelve-inch (305 mm) Zeiss refracting telescope in the east dome, a triple-beam coelostat (solar telescope) in the west dome, and a thirty-eight foot relief model of the moon's north polar region.
The Griffith Observatory after renovations, June 2007.
Col. Griffith requested that the observatory include a display on evolution which was accomplished with the Cosmochron exhibit which included a narration from Caltech Professor Chester Stock and an accompanying slide show. The evolution exhibit existed from 1937 to the mid 1960s.
Also included in the original design was a planetarium under the large central dome. The first shows covered topics including the Moon, worlds of the solar system, and eclipses.
During World War II the planetarium was used to train pilots in celestial navigation. The planetarium was again used for this purpose in the 1960s to train Apollo program astronauts for the first lunar missions.
The planetarium theater was renovated in 1964 and a Mark IV Zeiss projector was installed.
View from a trail in Griffith Park from the south, looking north.
3,015 acres (12.20 km2) of land surrounding the observatory was donated to the City of Los Angeles by Colonel Griffith J. Griffith on December 16, 1896.[1] In his will Griffith donated funds to build an observatory, exhibit hall, and planetarium on the donated land. As a Works Progress Administration (WPA) project,[2] construction began on June 20, 1933, using a design developed by architect John C. Austin based on preliminary sketches by Russell W. Porter.[1] The observatory and accompanying exhibits were opened to the public on May 14, 1935. In its first five days of operation the observatory logged more than 13,000 visitors. Dinsmore Alter was the museum's director during its first years; today, Dr. Ed Krupp is the director of the Observatory.The first exhibit visitors encountered in 1935 was the Foucault pendulum, which was designed to demonstrate the rotation of the Earth.[3] The exhibits also included a twelve-inch (305 mm) Zeiss refracting telescope in the east dome, a triple-beam coelostat (solar telescope) in the west dome, and a thirty-eight foot relief model of the moon's north polar region.
The Griffith Observatory after renovations, June 2007.
Col. Griffith requested that the observatory include a display on evolution which was accomplished with the Cosmochron exhibit which included a narration from Caltech Professor Chester Stock and an accompanying slide show. The evolution exhibit existed from 1937 to the mid 1960s.
Also included in the original design was a planetarium under the large central dome. The first shows covered topics including the Moon, worlds of the solar system, and eclipses.
During World War II the planetarium was used to train pilots in celestial navigation. The planetarium was again used for this purpose in the 1960s to train Apollo program astronauts for the first lunar missions.
The planetarium theater was renovated in 1964 and a Mark IV Zeiss projector was installed.
Sunday, November 4, 2012
The World Trade Center is a site for various buildings in Lower Manhattan, New York City, United States. The original World Trade Center was a complex of seven buildings. It featured landmark twin towers, which opened on April 4, 1973 and were destroyed in the September 11 attacks of 2001. The other buildings in the complex were damaged in the attacks and eventually destroyed. The site is being rebuilt with five new skyscrapers and a memorial to the casualties of the attacks. As of November 2011, only one skyscraper has been completed; the other four are expected to be completed before 2020. One World Trade Center will be the lead building for the new complex, reaching more than 100 stories at its completion.[2] It became the tallest building in New York City on April 30, 2012, and is expected to be finished by 2013. A sixth tower is awaiting confirmation.
At the time of their completion, the original 1 World Trade Center (the North Tower) and 2 World Trade Center (the South Tower), known collectively as the Twin Towers, were the tallest buildings in the world. The other buildings included 3 WTC (the Marriott World Trade Center), 4 WTC, 5 WTC, 6 WTC (which housed United States Customs), and 7 WTC. All of these buildings were built between 1975 and 1985.
The complex was designed in the early 1960s by Minoru Yamasaki and Associates of Troy, Michigan, and Emery Roth and Sons of New York.[3] The twin 110-story towers used a tube-frame structural design. To gain approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad, which became the Port Authority Trans-Hudson (PATH). Groundbreaking for the World Trade Center took place on August 5, 1966. The North Tower was completed in December 1972 and the South Tower was finished in July 1973. The construction project involved excavating a large amount of material, which was later used as landfill to build Battery Park City on the west side of Lower Manhattan. The cost for the construction was $400 million ($2,300,000,000 in 2012 dollars).[4] The complex was located in the heart of New York City's downtown financial district and contained 13.4 million square feet (1.24 million m2) of office space.[5][6]
The Windows on the World restaurant was located on the 106th and 107th floors of 1 World Trade Center (the North Tower) while the Top of the World observation deck was located on the 107th floor of 2 World Trade Center (the South Tower). The second King Kong film was filmed in 1976 with some scenes mentioning and showing the World Trade Center.
The World Trade Center experienced a fire on February 13, 1975, a bombing on February 26, 1993 and a robbery on January 14, 1998. In 1998, the Port Authority decided to privatize the World Trade Center, leasing the buildings to a private company to manage, and awarded the lease to Silverstein Properties in July 2001.
On the morning of September 11, 2001, Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex, one into each tower, in a coordinated terrorist attack. After burning for 56 minutes, the South Tower (2) collapsed, followed a half-hour later by the North Tower (1), with the attacks on the World Trade Center resulting in 2,753 deaths.[7] 7 World Trade Center collapsed later in the day and the other buildings, although they did not collapse, had to be demolished because they were damaged beyond repair. The process of cleanup and recovery at the World Trade Center site took eight months.
Over the following years, plans for a rebuilt World Trade Center took form. The first new building at the site was 7 World Trade Center, which opened in May 2006. The Lower Manhattan Development Corporation (LMDC), established in November 2001 to oversee the rebuilding process, organized competitions to select a site plan and memorial design. Memory Foundations, designed by Daniel Libeskind, was selected as the master plan, but this went through substantial changes in design. The new World Trade Center complex will include One World Trade Center, three other high-rise office towers, and the National September 11 Memorial & Museum.In March 1965, the Port Authority began acquiring property at the World Trade Center site.[40] Demolition work began on March 21, 1966, to clear thirteen square blocks of low rise buildings in Radio Row for construction of the World Trade Center.[41] Groundbreaking for the construction of the World Trade Center took place on August 5, 1966.[42]
The site of the World Trade Center was located on landfill with the bedrock located 65 feet (20 m) below.[43] To construct the World Trade Center, it was necessary to build a "bathtub" with a slurry wall around the West Street side of the site, to keep water from the Hudson River out.[44] The slurry method selected by Port Authority's chief engineer, John M. Kyle, Jr., involved digging a trench, and as excavation proceeded, filling the space with a "slurry" mixture composed of bentonite and water, which plugged holes and kept groundwater out. When the trench was dug out, a steel cage was inserted and concrete was poured in, forcing the "slurry" out. It took fourteen months for the slurry wall to be completed; it was necessary before excavation of material from the interior of the site could begin.[45] The 1.2 million cubic yards (917,000 m3) of material excavated were used (along with other fill and dredge material) to expand the Manhattan shoreline across West Street to form Battery Park City.[46][47]
In January 1967, the Port Authority awarded $74 million in contracts to various steel suppliers, and Karl Koch was hired to erect the steel.[48] Tishman Realty & Construction was hired in February 1967 to oversee construction of the project.[49] Construction work began on the North Tower in August 1968; construction on the South Tower was underway by January 1969.[50] The original Hudson Tubes, carrying PATH trains into Hudson Terminal, remained in service as elevated tunnels during the construction process until 1971 when a new PATH station opened.[51]
The topping out ceremony of 1 WTC (North Tower) took place on December 23, 1970, while 2 WTC's ceremony (South Tower) occurred later on July 19, 1971.[50] The first tenants moved into the North Tower in December 1970; the South Tower accepted tenants in January 1972.[52] When the World Trade Center twin towers were completed, the total costs to the Port Authority had reached $900 million.[53] The ribbon cutting ceremony was on April 4, 1973.[54]On September 11, 2001, terrorists hijacked American Airlines Flight 11 and crashed it into the northern façade of the North Tower at 8:46:40 a.m., the aircraft striking between the 93rd and 99th floors. Seventeen minutes later, at 9:03:11 a.m., a second team of terrorists crashed the similarly hijacked United Airlines Flight 175 into the South Tower, striking it between the 77th and 85th floors.[116] The damage caused to the North Tower by Flight 11 destroyed any means of escape from above the impact zone, trapping 1,344 people.[117] Flight 175 had a much more off-centered impact compared to Flight 11, and a single stairwell was left intact; however, only a few people managed to pass through it successfully before the tower collapsed. Although the South Tower was struck lower than the North Tower, thus affecting more floors, a smaller number, fewer than 700, were killed instantly or trapped.[118]
At 9:59 a.m., the South Tower collapsed after burning for approximately 56 minutes. The fire caused steel structural elements, already weakened from the plane impact, to fail. The North Tower collapsed at 10:28 a.m., after burning for approximately 102 minutes.[119] At 5:20 p.m.[120] on September 11, 2001, 7 World Trade Center started to collapse with the crumble of the east penthouse, and it collapsed completely at 5:21 p.m.[120] owing to uncontrolled fires causing structural failure.[121]
The 3 World Trade Center, a Marriott hotel, was destroyed during the collapse of the two towers. The three remaining buildings in the WTC plaza were extensively damaged by debris and later were demolished.[122] The Deutsche Bank Building across Liberty Street from the World Trade Center complex was later condemned owing to the uninhabitable toxic conditions inside; it was deconstructed, with work completed in early 2011.[123][124] The Borough of Manhattan Community College's Fiterman Hall at 30 West Broadway was also condemned owing to extensive damage in the attacks and is slated for deconstruction.The process of cleanup and recovery continued 24 hours a day over a period of eight months. Debris was transported from the World Trade Center site to Fresh Kills on Staten Island, where it was further sifted. On May 30, 2002, a ceremony was held to officially mark the end of the cleanup efforts.[139] In 2002, ground was broken on construction of a new 7WTC building located just to the north of the main World Trade Center site. Since it was not part of the site master plan, Larry Silverstein was able to proceed without delay on the rebuilding of 7 World Trade Center, which was completed and officially opened in May 2006; this had been considered a priority since restoring the Consolidated Edison Cos. electrical substation in the building's lower floors was necessary to meet power demands of Lower Manhattan.[140][141][142] While 7 World Trade Center was not part of the master plan for the Twin Towers site, Silverstein and Con Edison recognized that the rebuilding of 7 World Trade Center would have to be consistent with the master plan which was expected to re-open the street grid which had been blocked by the original World Trade Center super-block. As a result, the design for the new 7 World Trade Center allowed for the re-opening of Greenwich Street, which had been blocked by the original 7 World Trade Center.[143] A temporary PATH station at the World Trade Center opened in November 2003; it will be replaced by a permanent station designed by Santiago Calatrava.[144]
With the main World Trade Center site, numerous stakeholders were involved including Silverstein and the Port Authority, which in turn meant the Governor of New York State, George Pataki, had some authority. In addition, the victims' families, people in the surrounding neighborhoods, Mayor Michael Bloomberg, and others wanted input. Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001 as an official commission to oversee the rebuilding process.[145] The LMDC held a competition to solicit possible designs for the site. The Memory Foundations design by Daniel Libeskind was chosen as the master plan for the World Trade Center site.[146] The plan included the 1,776 feet (541 m) Freedom Tower (now known as One World Trade Center) as well as a memorial and a number of other office towers. Out of the World Trade Center Site Memorial Competition, a design by Michael Arad and Peter Walker titled Reflecting Absence was selected in January 2004.[147]
On March 13, 2006, workers arrived at the World Trade Center site to remove remaining debris and start surveying work. This marked the official start of construction of the National September 11 Memorial & Museum, though not without controversy and concerns from some family members.[148] In April 2006, the Port Authority and Larry Silverstein reached an agreement in which Silverstein ceded rights to develop the Freedom Tower and Tower Five in exchange for financing with Liberty Bonds for Towers Two, Three, and Four.[149][150] On April 27, 2006, a ground-breaking ceremony was held for the Freedom Tower.[151]
In May 2006, architects Richard Rogers and Fumihiko Maki were announced as the architects for Towers Three and Four, respectively.[152] The final designs for Towers Two, Three and Four were unveiled on September 7, 2006. Tower Two, or 200 Greenwich Street, will have a roof height of 1,254 feet (382 m) and a 96 feet (29 m) tripod spire for a total of 1,350 feet (410 m). Tower Three, or 175 Greenwich Street will have a roof height of 1,155 feet (352 m) and an antenna height reaching 1,255 feet (383 m). Tower Four, or 150 Greenwich Street, will have an overall height of 946 feet (288 m).[153] On June 22, 2007, the Port Authority of New York and New Jersey announced that JP Morgan Chase will build Tower 5, a 42-story building on Site 5 occupied by the Deutsche Bank Building,[154] and Kohn Pedersen Fox was selected as the architect for the building.[155] Four renowned architects, including Spanish architect Santiago Calatrava, who designed the transit hub, One WTC designer David Childs of Skidmore, Owings and Merrill, and the famed British architect Norman Foster of Foster and Partners designed Tower Two and masterminded the iconic diamond design, will greatly enhance the street-level atmosphere of the rebuilt site. The projects will be complete between early 2013 to mid 2014.[156]
As of August 2011, One World Trade Center is at 80 stories with glass up to the 54th floor, Tower Four is up around 38 stories with glass up to the 15th floor, and the former Deutsche Bank Building has been completely dismantled and the Port Authority is working on their Vehicle Security Center.[157] The World Trade Center Transportation Hub's PATH hall is nearly complete. The memorial officially opened to relatives of the deceased on September 11, 2011, and to the general public on September 12. World Trade Center Tower Three's foundations are becoming visible, and will be completed in mid 2014 if Silverstein Properties can meet requirements set by the Port Authority, as they very likely will.[158][159] Tower Two will also be completed on schedule according to the construction company. In the December of 2011, Tower Two's foundations are finished and is starting to assemble the frame. [160] Because numerous American and Chinese companies are "very interested" in leasing space at the WTC, Two World Trade Center is likely to be finished earlier than expected.[161] Publishing Giant Conde Nast has agreed to move its headquarters to One World Trade Center, and with this shift, many more are expected to follow.[162][125]
In the immediate aftermath of the attacks, media reports suggested that tens of thousands might have been killed in the attacks, as over 50,000 people could be inside the towers. Ultimately, 2,753 death certificates (excluding those for hijackers) were filed relating to the 9/11 attacks in New York, including one filed for Felicia Dunn-Jones, who was added to the official death toll in May 2007; Dunn-Jones died five months later from a lung condition linked to exposure to dust during the collapse of the World Trade Center.[126] Three other victims were then added to the official death toll by the city medical examiner's office: Dr. Sneha Anne Philip, who was last seen the day before the attacks; Leon Heyward, a man who developed lymphoma and subsequently died in 2008 as a result of dust ingestion during the events following the attacks to the Twin Towers;[127][128] and Jerry Borg, who died in December 2010 of pulmonary sarcoidosis determined in June 2011 to be the result of dust from the attacks.[7] Cantor Fitzgerald L.P., an investment bank on the 101st–105th floors of One World Trade Center, lost 658 employees, considerably more than any other employer,[129] while Marsh & McLennan Companies, located immediately below Cantor Fitzgerald on floors 93–101 (the location of Flight 11's impact), lost 295 employees, and 175 employees of Aon Corporation were killed.[130] In addition, 343 of the dead were New York City firefighters, 84 were Port Authority employees, of whom 37 were members of the Port Authority Police Department, and another 23 were New York City Police Department officers.[131][132][133] Ten years after the attacks, only 1,629 victims have been identified.[134] Of all the people who were still in the towers when they collapsed, only 20 were pulled out alive. PAPD Officers William Jimeno and Sgt. John McLoughlin were survivors 18 and 19.[135]
At the time of their completion, the original 1 World Trade Center (the North Tower) and 2 World Trade Center (the South Tower), known collectively as the Twin Towers, were the tallest buildings in the world. The other buildings included 3 WTC (the Marriott World Trade Center), 4 WTC, 5 WTC, 6 WTC (which housed United States Customs), and 7 WTC. All of these buildings were built between 1975 and 1985.
The complex was designed in the early 1960s by Minoru Yamasaki and Associates of Troy, Michigan, and Emery Roth and Sons of New York.[3] The twin 110-story towers used a tube-frame structural design. To gain approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad, which became the Port Authority Trans-Hudson (PATH). Groundbreaking for the World Trade Center took place on August 5, 1966. The North Tower was completed in December 1972 and the South Tower was finished in July 1973. The construction project involved excavating a large amount of material, which was later used as landfill to build Battery Park City on the west side of Lower Manhattan. The cost for the construction was $400 million ($2,300,000,000 in 2012 dollars).[4] The complex was located in the heart of New York City's downtown financial district and contained 13.4 million square feet (1.24 million m2) of office space.[5][6]
The Windows on the World restaurant was located on the 106th and 107th floors of 1 World Trade Center (the North Tower) while the Top of the World observation deck was located on the 107th floor of 2 World Trade Center (the South Tower). The second King Kong film was filmed in 1976 with some scenes mentioning and showing the World Trade Center.
The World Trade Center experienced a fire on February 13, 1975, a bombing on February 26, 1993 and a robbery on January 14, 1998. In 1998, the Port Authority decided to privatize the World Trade Center, leasing the buildings to a private company to manage, and awarded the lease to Silverstein Properties in July 2001.
On the morning of September 11, 2001, Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex, one into each tower, in a coordinated terrorist attack. After burning for 56 minutes, the South Tower (2) collapsed, followed a half-hour later by the North Tower (1), with the attacks on the World Trade Center resulting in 2,753 deaths.[7] 7 World Trade Center collapsed later in the day and the other buildings, although they did not collapse, had to be demolished because they were damaged beyond repair. The process of cleanup and recovery at the World Trade Center site took eight months.
Over the following years, plans for a rebuilt World Trade Center took form. The first new building at the site was 7 World Trade Center, which opened in May 2006. The Lower Manhattan Development Corporation (LMDC), established in November 2001 to oversee the rebuilding process, organized competitions to select a site plan and memorial design. Memory Foundations, designed by Daniel Libeskind, was selected as the master plan, but this went through substantial changes in design. The new World Trade Center complex will include One World Trade Center, three other high-rise office towers, and the National September 11 Memorial & Museum.In March 1965, the Port Authority began acquiring property at the World Trade Center site.[40] Demolition work began on March 21, 1966, to clear thirteen square blocks of low rise buildings in Radio Row for construction of the World Trade Center.[41] Groundbreaking for the construction of the World Trade Center took place on August 5, 1966.[42]
The site of the World Trade Center was located on landfill with the bedrock located 65 feet (20 m) below.[43] To construct the World Trade Center, it was necessary to build a "bathtub" with a slurry wall around the West Street side of the site, to keep water from the Hudson River out.[44] The slurry method selected by Port Authority's chief engineer, John M. Kyle, Jr., involved digging a trench, and as excavation proceeded, filling the space with a "slurry" mixture composed of bentonite and water, which plugged holes and kept groundwater out. When the trench was dug out, a steel cage was inserted and concrete was poured in, forcing the "slurry" out. It took fourteen months for the slurry wall to be completed; it was necessary before excavation of material from the interior of the site could begin.[45] The 1.2 million cubic yards (917,000 m3) of material excavated were used (along with other fill and dredge material) to expand the Manhattan shoreline across West Street to form Battery Park City.[46][47]
In January 1967, the Port Authority awarded $74 million in contracts to various steel suppliers, and Karl Koch was hired to erect the steel.[48] Tishman Realty & Construction was hired in February 1967 to oversee construction of the project.[49] Construction work began on the North Tower in August 1968; construction on the South Tower was underway by January 1969.[50] The original Hudson Tubes, carrying PATH trains into Hudson Terminal, remained in service as elevated tunnels during the construction process until 1971 when a new PATH station opened.[51]
The topping out ceremony of 1 WTC (North Tower) took place on December 23, 1970, while 2 WTC's ceremony (South Tower) occurred later on July 19, 1971.[50] The first tenants moved into the North Tower in December 1970; the South Tower accepted tenants in January 1972.[52] When the World Trade Center twin towers were completed, the total costs to the Port Authority had reached $900 million.[53] The ribbon cutting ceremony was on April 4, 1973.[54]On September 11, 2001, terrorists hijacked American Airlines Flight 11 and crashed it into the northern façade of the North Tower at 8:46:40 a.m., the aircraft striking between the 93rd and 99th floors. Seventeen minutes later, at 9:03:11 a.m., a second team of terrorists crashed the similarly hijacked United Airlines Flight 175 into the South Tower, striking it between the 77th and 85th floors.[116] The damage caused to the North Tower by Flight 11 destroyed any means of escape from above the impact zone, trapping 1,344 people.[117] Flight 175 had a much more off-centered impact compared to Flight 11, and a single stairwell was left intact; however, only a few people managed to pass through it successfully before the tower collapsed. Although the South Tower was struck lower than the North Tower, thus affecting more floors, a smaller number, fewer than 700, were killed instantly or trapped.[118]
At 9:59 a.m., the South Tower collapsed after burning for approximately 56 minutes. The fire caused steel structural elements, already weakened from the plane impact, to fail. The North Tower collapsed at 10:28 a.m., after burning for approximately 102 minutes.[119] At 5:20 p.m.[120] on September 11, 2001, 7 World Trade Center started to collapse with the crumble of the east penthouse, and it collapsed completely at 5:21 p.m.[120] owing to uncontrolled fires causing structural failure.[121]
The 3 World Trade Center, a Marriott hotel, was destroyed during the collapse of the two towers. The three remaining buildings in the WTC plaza were extensively damaged by debris and later were demolished.[122] The Deutsche Bank Building across Liberty Street from the World Trade Center complex was later condemned owing to the uninhabitable toxic conditions inside; it was deconstructed, with work completed in early 2011.[123][124] The Borough of Manhattan Community College's Fiterman Hall at 30 West Broadway was also condemned owing to extensive damage in the attacks and is slated for deconstruction.The process of cleanup and recovery continued 24 hours a day over a period of eight months. Debris was transported from the World Trade Center site to Fresh Kills on Staten Island, where it was further sifted. On May 30, 2002, a ceremony was held to officially mark the end of the cleanup efforts.[139] In 2002, ground was broken on construction of a new 7WTC building located just to the north of the main World Trade Center site. Since it was not part of the site master plan, Larry Silverstein was able to proceed without delay on the rebuilding of 7 World Trade Center, which was completed and officially opened in May 2006; this had been considered a priority since restoring the Consolidated Edison Cos. electrical substation in the building's lower floors was necessary to meet power demands of Lower Manhattan.[140][141][142] While 7 World Trade Center was not part of the master plan for the Twin Towers site, Silverstein and Con Edison recognized that the rebuilding of 7 World Trade Center would have to be consistent with the master plan which was expected to re-open the street grid which had been blocked by the original World Trade Center super-block. As a result, the design for the new 7 World Trade Center allowed for the re-opening of Greenwich Street, which had been blocked by the original 7 World Trade Center.[143] A temporary PATH station at the World Trade Center opened in November 2003; it will be replaced by a permanent station designed by Santiago Calatrava.[144]
With the main World Trade Center site, numerous stakeholders were involved including Silverstein and the Port Authority, which in turn meant the Governor of New York State, George Pataki, had some authority. In addition, the victims' families, people in the surrounding neighborhoods, Mayor Michael Bloomberg, and others wanted input. Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001 as an official commission to oversee the rebuilding process.[145] The LMDC held a competition to solicit possible designs for the site. The Memory Foundations design by Daniel Libeskind was chosen as the master plan for the World Trade Center site.[146] The plan included the 1,776 feet (541 m) Freedom Tower (now known as One World Trade Center) as well as a memorial and a number of other office towers. Out of the World Trade Center Site Memorial Competition, a design by Michael Arad and Peter Walker titled Reflecting Absence was selected in January 2004.[147]
On March 13, 2006, workers arrived at the World Trade Center site to remove remaining debris and start surveying work. This marked the official start of construction of the National September 11 Memorial & Museum, though not without controversy and concerns from some family members.[148] In April 2006, the Port Authority and Larry Silverstein reached an agreement in which Silverstein ceded rights to develop the Freedom Tower and Tower Five in exchange for financing with Liberty Bonds for Towers Two, Three, and Four.[149][150] On April 27, 2006, a ground-breaking ceremony was held for the Freedom Tower.[151]
In May 2006, architects Richard Rogers and Fumihiko Maki were announced as the architects for Towers Three and Four, respectively.[152] The final designs for Towers Two, Three and Four were unveiled on September 7, 2006. Tower Two, or 200 Greenwich Street, will have a roof height of 1,254 feet (382 m) and a 96 feet (29 m) tripod spire for a total of 1,350 feet (410 m). Tower Three, or 175 Greenwich Street will have a roof height of 1,155 feet (352 m) and an antenna height reaching 1,255 feet (383 m). Tower Four, or 150 Greenwich Street, will have an overall height of 946 feet (288 m).[153] On June 22, 2007, the Port Authority of New York and New Jersey announced that JP Morgan Chase will build Tower 5, a 42-story building on Site 5 occupied by the Deutsche Bank Building,[154] and Kohn Pedersen Fox was selected as the architect for the building.[155] Four renowned architects, including Spanish architect Santiago Calatrava, who designed the transit hub, One WTC designer David Childs of Skidmore, Owings and Merrill, and the famed British architect Norman Foster of Foster and Partners designed Tower Two and masterminded the iconic diamond design, will greatly enhance the street-level atmosphere of the rebuilt site. The projects will be complete between early 2013 to mid 2014.[156]
As of August 2011, One World Trade Center is at 80 stories with glass up to the 54th floor, Tower Four is up around 38 stories with glass up to the 15th floor, and the former Deutsche Bank Building has been completely dismantled and the Port Authority is working on their Vehicle Security Center.[157] The World Trade Center Transportation Hub's PATH hall is nearly complete. The memorial officially opened to relatives of the deceased on September 11, 2011, and to the general public on September 12. World Trade Center Tower Three's foundations are becoming visible, and will be completed in mid 2014 if Silverstein Properties can meet requirements set by the Port Authority, as they very likely will.[158][159] Tower Two will also be completed on schedule according to the construction company. In the December of 2011, Tower Two's foundations are finished and is starting to assemble the frame. [160] Because numerous American and Chinese companies are "very interested" in leasing space at the WTC, Two World Trade Center is likely to be finished earlier than expected.[161] Publishing Giant Conde Nast has agreed to move its headquarters to One World Trade Center, and with this shift, many more are expected to follow.[162][125]
In the immediate aftermath of the attacks, media reports suggested that tens of thousands might have been killed in the attacks, as over 50,000 people could be inside the towers. Ultimately, 2,753 death certificates (excluding those for hijackers) were filed relating to the 9/11 attacks in New York, including one filed for Felicia Dunn-Jones, who was added to the official death toll in May 2007; Dunn-Jones died five months later from a lung condition linked to exposure to dust during the collapse of the World Trade Center.[126] Three other victims were then added to the official death toll by the city medical examiner's office: Dr. Sneha Anne Philip, who was last seen the day before the attacks; Leon Heyward, a man who developed lymphoma and subsequently died in 2008 as a result of dust ingestion during the events following the attacks to the Twin Towers;[127][128] and Jerry Borg, who died in December 2010 of pulmonary sarcoidosis determined in June 2011 to be the result of dust from the attacks.[7] Cantor Fitzgerald L.P., an investment bank on the 101st–105th floors of One World Trade Center, lost 658 employees, considerably more than any other employer,[129] while Marsh & McLennan Companies, located immediately below Cantor Fitzgerald on floors 93–101 (the location of Flight 11's impact), lost 295 employees, and 175 employees of Aon Corporation were killed.[130] In addition, 343 of the dead were New York City firefighters, 84 were Port Authority employees, of whom 37 were members of the Port Authority Police Department, and another 23 were New York City Police Department officers.[131][132][133] Ten years after the attacks, only 1,629 victims have been identified.[134] Of all the people who were still in the towers when they collapsed, only 20 were pulled out alive. PAPD Officers William Jimeno and Sgt. John McLoughlin were survivors 18 and 19.[135]
Saturday, November 3, 2012
La Masia de Can Planes, usually shortened to La Masia, (Catalan pronunciation: [ɫə məˈzi.ə], English: "The Farmhouse"),[1] is the name given to FC Barcelona's training facilities located near the Camp Nou in the Les Corts district of Barcelona, and is often used to generically describe the youth academy of Barcelona.
The youth academy of Barcelona holds more than 300 young players, and has been praised since 2002 as one of the best in the world, being a significant factor in FC Barcelona's European success as well as the Spanish national team's success at the 2010 FIFA World Cup. In 2010, la Masia achieved a record breaking honour becoming the first youth academy to have trained all three finalists for the Ballon d'Or in one same year, with Andrés Iniesta, Lionel Messi and Xavi Hernández.[2]
The building itself is an ancient country residence (In Catalan: masia) built in 1702, and once Camp Nou was inaugurated in 1957, the building was remodelled and extended for use as the club's social headquarters. With the gradual expansion of the club, the building became too small for headquarters, and, on 20 October 1979, La Masia was converted into a dormitory for young players from outside of Barcelona. On June, 30, 2011 the Masia building ceased housing the young sportsmen who are trained to become a part of the Club’s professional teams. In a simple, but emotionally charged ceremony, the doors were closed and the new Masia-Centre de Formació Oriol Tort, at the Ciutat Esportiva Joan Gamper, took over the function of the residential center for the youngsters.La Masia was an old country residence, built in 1702, before its purchase by FC Barcelona in 1954. The football club initially used La Masia as a workshop for the architects, engineers and constructors of its new stadium, Camp Nou. After Camp Nou was inaugurated on 24 September 1957, La Masia was closed down. Under the presidency of Enric Llaudet, the building was remodeled and extended; it reopened as an office for the club's headquarters on 26 September 1966. La Masia could not accommodate the increasing number of employees as the club grew, and president Josep Núñez remodelled it in 1979 to house a young academy of players who came from outside of Barcelona.[3][4] The idea for the youth academy was proposed to Núñez by Johan Cruyff, a former player who was a youth-product from the Ajax Academy. Núñez installed Oriol Tort as director.[5]
One of the first graduates of the academy was the midfielder Guillermo Amor, who débuted in 1988. Amor went on to play 311 La Liga matches for the first team. Two years later, he was followed by goalkeeper Carles Busquets and midfielder Pep Guardiola.[6] All three made their first team début under Cruyff, who was made manager of the first team in 1988. The team played to Cruyff's tiki-taka philosophy, derived from total football, which has often been attributed as a key component in Barcelona's later success and international appeal.[7][8][9] Guardiola matured into a total-football midfielder, and became a source of inspiration for later midfielders from La Masia, such as Xavi Hernández, Andrés Iniesta and Cesc Fàbregas.[10] Xavi, who was Guardiola's understudy for three years, said in 2010 that he once considered transferring abroad because of the pressure and high expectations placed on him to fill Guardiola's role in the midfield.[11]
Guardiola was appointed the new coach of FC Barcelona B in May 2007. At that time, the team was in organisational disarray as it entered the fourth tier of Spanish football. The relegation of the B team was a cause in the disbanding of FC Barcelona C, which played in that league. In Guardiola's re-organisation of the reserve side, he made places available in Barcelona B to players above the age of 21; his aim was to increase competition within the team and help it advance into a more competitive league. He divided the players into two categories: "pearls", which was composed of the young players, and the "backbone", which was mostly composed of those who were more mature. The "backbone players" were between 21 and 26 years old and they stayed in the B team for a maximum of two years before being sold. Guardiola said the two-year duration was to allow for room to constantly develop youth players.[5]
After re-organising the youth side, Guardiola convinced club president Laporta of the need for better training facilities, and the youth teams moved to La Ciutat Esportiva Joan Gamper, where Laporta had various technical laboratories installed so the coaches could follow the training more closely. By the end of the 2007–08 season, Barcelona B was promoted to the third tier, Segunda B, and, at the end of 2009–10, to the second tier Segunda, which was the top-tier for a reserve team (the first-team plays in the Primera Division).[5]
La Masia received more publicity after Barcelona B's success with homegrown players; Rory Smith reported in The Daily Telegraph that La Masia "has replaced the fabled Ajax Academy as football's foremost production line."[12] The recent fame and success of La Masia as a talent school was ascribed by Ian Hawkey of The Times to the class of 1987, which featured prominent members as Cesc Fàbregas, Lionel Messi, Gerard Piqué and Pedro Rodríguez.[13] In 2000, Louis van Gaal, coach of FC Barcelona's first team, was widely ridiculed by the city sports media for his dream to win the Champions League with 11 home-grown players. The first team won the trophy in 2009 with eight home-grown players.[5]
In the 30 years since La Masia's inauguration, more than 500 youngsters have left their homes and families to stay at the academy. About half of them were from Catalonia, and the rest came from other regions of the Kingdom of Spain and beyond, including 15 from Cameroon, 7 from Brazil, 5 from Senegal and 3 from Argentina. Of those 500, about 10 percent made it into the first team.[
The youth academy of Barcelona holds more than 300 young players, and has been praised since 2002 as one of the best in the world, being a significant factor in FC Barcelona's European success as well as the Spanish national team's success at the 2010 FIFA World Cup. In 2010, la Masia achieved a record breaking honour becoming the first youth academy to have trained all three finalists for the Ballon d'Or in one same year, with Andrés Iniesta, Lionel Messi and Xavi Hernández.[2]
The building itself is an ancient country residence (In Catalan: masia) built in 1702, and once Camp Nou was inaugurated in 1957, the building was remodelled and extended for use as the club's social headquarters. With the gradual expansion of the club, the building became too small for headquarters, and, on 20 October 1979, La Masia was converted into a dormitory for young players from outside of Barcelona. On June, 30, 2011 the Masia building ceased housing the young sportsmen who are trained to become a part of the Club’s professional teams. In a simple, but emotionally charged ceremony, the doors were closed and the new Masia-Centre de Formació Oriol Tort, at the Ciutat Esportiva Joan Gamper, took over the function of the residential center for the youngsters.La Masia was an old country residence, built in 1702, before its purchase by FC Barcelona in 1954. The football club initially used La Masia as a workshop for the architects, engineers and constructors of its new stadium, Camp Nou. After Camp Nou was inaugurated on 24 September 1957, La Masia was closed down. Under the presidency of Enric Llaudet, the building was remodeled and extended; it reopened as an office for the club's headquarters on 26 September 1966. La Masia could not accommodate the increasing number of employees as the club grew, and president Josep Núñez remodelled it in 1979 to house a young academy of players who came from outside of Barcelona.[3][4] The idea for the youth academy was proposed to Núñez by Johan Cruyff, a former player who was a youth-product from the Ajax Academy. Núñez installed Oriol Tort as director.[5]
One of the first graduates of the academy was the midfielder Guillermo Amor, who débuted in 1988. Amor went on to play 311 La Liga matches for the first team. Two years later, he was followed by goalkeeper Carles Busquets and midfielder Pep Guardiola.[6] All three made their first team début under Cruyff, who was made manager of the first team in 1988. The team played to Cruyff's tiki-taka philosophy, derived from total football, which has often been attributed as a key component in Barcelona's later success and international appeal.[7][8][9] Guardiola matured into a total-football midfielder, and became a source of inspiration for later midfielders from La Masia, such as Xavi Hernández, Andrés Iniesta and Cesc Fàbregas.[10] Xavi, who was Guardiola's understudy for three years, said in 2010 that he once considered transferring abroad because of the pressure and high expectations placed on him to fill Guardiola's role in the midfield.[11]
Guardiola was appointed the new coach of FC Barcelona B in May 2007. At that time, the team was in organisational disarray as it entered the fourth tier of Spanish football. The relegation of the B team was a cause in the disbanding of FC Barcelona C, which played in that league. In Guardiola's re-organisation of the reserve side, he made places available in Barcelona B to players above the age of 21; his aim was to increase competition within the team and help it advance into a more competitive league. He divided the players into two categories: "pearls", which was composed of the young players, and the "backbone", which was mostly composed of those who were more mature. The "backbone players" were between 21 and 26 years old and they stayed in the B team for a maximum of two years before being sold. Guardiola said the two-year duration was to allow for room to constantly develop youth players.[5]
After re-organising the youth side, Guardiola convinced club president Laporta of the need for better training facilities, and the youth teams moved to La Ciutat Esportiva Joan Gamper, where Laporta had various technical laboratories installed so the coaches could follow the training more closely. By the end of the 2007–08 season, Barcelona B was promoted to the third tier, Segunda B, and, at the end of 2009–10, to the second tier Segunda, which was the top-tier for a reserve team (the first-team plays in the Primera Division).[5]
La Masia received more publicity after Barcelona B's success with homegrown players; Rory Smith reported in The Daily Telegraph that La Masia "has replaced the fabled Ajax Academy as football's foremost production line."[12] The recent fame and success of La Masia as a talent school was ascribed by Ian Hawkey of The Times to the class of 1987, which featured prominent members as Cesc Fàbregas, Lionel Messi, Gerard Piqué and Pedro Rodríguez.[13] In 2000, Louis van Gaal, coach of FC Barcelona's first team, was widely ridiculed by the city sports media for his dream to win the Champions League with 11 home-grown players. The first team won the trophy in 2009 with eight home-grown players.[5]
In the 30 years since La Masia's inauguration, more than 500 youngsters have left their homes and families to stay at the academy. About half of them were from Catalonia, and the rest came from other regions of the Kingdom of Spain and beyond, including 15 from Cameroon, 7 from Brazil, 5 from Senegal and 3 from Argentina. Of those 500, about 10 percent made it into the first team.[