Burj Khalifa (Arabic: برج خليفة), known as Burj Dubai prior to its inauguration, is a supertall skyscraper in Dubai, United Arab Emirates, and is the tallest man-made structure in the world, at 829.8 m (2,722 ft).[3][8]
Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010,[1][9] and is part of the new 2 km2 (490-acre) development called Downtown Dubai at the 'First Interchange' along Sheikh Zayed Road, near Dubai's main business district. The tower's architecture and engineering were performed by Skidmore, Owings and Merrill of Chicago, with Adrian Smith as chief architect, and Bill Baker as chief structural engineer.[10][11] The primary contractor was Samsung C&T of South Korea.[12]
In March 2009, Mohamed Ali Alabbar, chairman of the project's developer, Emaar Properties, said office space pricing at Burj Khalifa reached US$4,000 per sq ft (over US$43,000 per m²) and the Armani Residences, also in Burj Khalifa, sold for US$3,500 per sq ft (over US$37,500 per m²).[13] He estimated the total cost for the project to be about US$1.5 billion.[2]
The project's completion coincided with the global financial crisis of 2007–2012, and with vast overbuilding in the country; this led to high vacancies and foreclosures.[14] With Dubai mired in debt from its huge ambitions, the government was forced to seek multibillion dollar bailouts from its oil-rich neighbor Abu Dhabi. Subsequently, in a surprise move at its opening ceremony, the tower was renamed Burj Khalifa, said to honour the UAE President Khalifa bin Zayed Al Nahyan for his crucial support.[15][8]
Due to the slumping demand in Dubai's property market, the rents in the Burj Khalifa plummeted 40% some ten months after its opening. Out of 900 apartments in the tower, 825 were still empty at that time.[16][17] By October 2012, Emaar reported that around 80% of the apartments were occupied.[18]The tower was constructed by South Korean company, Samsung Engineering & Construction, which also did work on the Petronas Twin Towers and Taipei 101.[88] Samsung Engineering & Construction built the tower in a joint venture with Besix from Belgium and Arabtec from UAE. Turner is the Project Manager on the main construction contract.[89]
Under UAE law, the Contractor and the Engineer of Record, Hyder Consulting, is jointly and severally liable for the performance of Burj Khalifa.
The primary structure is reinforced concrete. Putzmeister created a new, super high-pressure trailer concrete pump, the BSA 14000 SHP-D, for this project.[24] Over 45,000 m3 (58,900 cu yd) of concrete, weighing more than 110,000 tonnes (120,000 short tons; 110,000 long tons) were used to construct the concrete and steel foundation, which features 192 piles; each pile is 1.5 metre diameter x 43 m long, buried more than 50 m (164 ft) deep.[25] Burj Khalifa's construction used 330,000 m3 (431,600 cu yd) of concrete and 55,000 tonnes (61,000 short tons; 54,000 long tons) of steel rebar, and construction took 22 million man-hours.[10] A high density, low permeability concrete was used in the foundations of Burj Khalifa. A cathodic protection system under the mat is used to minimize any detrimental effects from corrosive chemicals in local ground water.[49] In May 2008 Putzmeister pumped concrete to a then world record delivery height of 606 m (1,988 ft),[24] the 156th floor. Three tower cranes were used during construction of the uppermost levels, each capable of lifting a 25-tonne load.[90] The remaining structure above is constructed of lighter steel.
Burj Khalifa is highly compartmentalised. Pressurized, air-conditioned refuge floors are located approximately every 35 floors where people can shelter on their long walk down to safety in case of an emergency or fire.[49][91]
Special mixes of concrete are made to withstand the extreme pressures of the massive building weight; as is typical with reinforced concrete construction, each batch of concrete used was tested to ensure it could withstand certain pressures. CTLGroup, working for SOM, conducted the creep and shrinkage testing critical for the structural analysis of the building.[92]
The consistency of the concrete used in the project was essential. It was difficult to create a concrete that could withstand both the thousands of tonnes bearing down on it and Persian Gulf temperatures that can reach 50 °C (122 °F). To combat this problem, the concrete was not poured during the day. Instead, during the summer months ice was added to the mixture and it was poured at night when the air is cooler and the humidity is higher. A cooler concrete mixture cures evenly throughout and is therefore less likely to set too quickly and crack. Any significant cracks could have put the entire project in jeopardy.
The unique design and engineering challenges of building Burj Khalifa have been featured in a number of television documentaries, including the Big, Bigger, Biggest series on the National Geographic and Five channels, and the Mega Builders series on the Discovery Channel.
Saturday, December 15, 2012
Monday, November 12, 2012

The Space Needle is a tower in Seattle, Washington and a major landmark of the Pacific Northwest region of the United States and a symbol of Seattle. Located at the Seattle Center, it was built for the 1962 World's Fair, during which time nearly 20,000 people a day used the elevators, with over 2.3 million visitors in all for the World Fair. The Space Needle is 605 feet (184 m) high at its highest point and 138 feet (42 m) wide at its widest point and weighs 9,550 tons. When it was completed it was the tallest structure west of the Mississippi River.[5] It is built to withstand winds of up to 200 miles per hour (89 m/s) and earthquakes of up to 9.1 magnitude,[6] which would protect the structure against an earthquake as powerful as the 1700 Cascadia earthquake. The tower also has 25 lightning rods on its roof to prevent lightning damage.The Space Needle features an observation deck at 520 feet (160 m), and a gift shop with the rotating SkyCity restaurant at 500 feet (150 m).[5] From the top of the Needle, one can see not only the Downtown Seattle skyline, but also the Olympic and Cascade Mountains, Mount Rainier, Mount Baker, Elliott Bay and surrounding islands. Photographs of the Seattle skyline often show the Space Needle in a prominent position, even appearing to tower above the rest of the city's skyscrapers, as well as Mount Rainier in the background. This occurs because the tower, which is equivalent in height to a 60-story building, stands more than a kilometer northwest of most downtown skyscrapers.
Visitors can reach the top of the Space Needle via elevators that travel at 10 miles per hour (4.5 m/s). The trip takes 41 seconds, and some tourists wait in hour-long lines in order to ascend to the top of the tower. On windy days, the elevators are slowed down to a speed of 5 miles per hour (2.2 m/s). The Space Needle was designated a historic landmark on April 19, 1999, by the City's Landmarks Preservation Board.[5][7] Edward E. Carlson, chairman of the 1962 World's Fair in Seattle, originally had an idea for erecting a tower with a restaurant at the World's Fair. Carlson was then president of a hotel company and not previously known for art or design, but he was inspired by a recent visit to the Stuttgart Tower of Germany.
John Graham, an architect who had won praise for designing Northgate Mall in Seattle soon became involved. Graham's first move was to make the restaurant featured in the plans revolve, in the same manner as a tower he had previously designed for the Ala Moana Shopping Center in Honolulu.
The proposed Space Needle had no land on which to be built. Since it was not financed by the city, land had to be purchased that was within the fairgrounds. The investors thought that there would be no land available to build a tower and the search for a site was nearly dead when, in 1961, they discovered a plot, 120 by 120 feet (37 by 37 m), containing switching equipment for the fire and police alarm systems. The land sold for $75,000. At this point, only one year remained before the World's Fair would begin.
It was privately built and financed by the "Pentagram Corporation" which consisted of Bagley Wright, contractor Howard S. Wright, architect John Graham, Ned Skinner, and Norton Clapp. In 1977 Bagley, Skinner and Clapp sold their interest to Howard Wright who now controls it under the name of Space Needle Corporation.[11]
The earthquake stability of the Space Needle was ensured when a hole was dug 30 feet (9.1 m) deep and 120 feet (37 m) across, and 467 concrete trucks took one full day to fill it. The foundation weighs 5850 tons, including 250 tons of reinforcing steel. With this concrete base weighing the same as the above-ground structure, the Needle's center of gravity is just 5 feet (1.5 m) above ground level. The structure is bolted to the foundation with 72 bolts, each one 30 feet (9.1 m) long.
With time an issue, the construction team worked around the clock. The domed top, housing the top five levels (including the restaurants and observation deck), was perfectly balanced so that the restaurant could rotate with the help of one tiny electric motor, originally 0.8 kilowatts (1.1 hp), later replaced with a 1.1 kilowatts (1.5 hp) motor. With paint colors named Orbital Olive for the body, Astronaut White for the legs, Re-entry Red for the saucer, and Galaxy Gold for the roof, the Space Needle was finished in less than one year. It was completed in April 1962 at a cost of $4.5 million. The last elevator car was installed the day before the Fair opened on April 21. During the course of the Fair nearly 20,000 people a day rode the elevators to the Observation Deck. The 20,000 mark was never reached, missed by fewer than 50 people one day. At the time of construction, it was the tallest building in the West, taking the title from the Smith Tower across town that had held that title since 1914.
During the World's Fair, an imitation carillon was installed in the Space Needle, and played several times a day. The carillon recreated the tones of a total of 538 bells, and was built by the Schulmerich Company under the name "Carillon Americana". The operator's console was located in the base of the Space Needle, completely enclosed in glass to allow observation of the musician playing the instrument. It was also capable of being played from a roll, just as a player piano would be. The stentors of the carillon were located in the bottom part of the disc, and were audible over the entire fairgrounds, and beyond.[12]
In 1974, author Stephen Cosgrove's children's book Wheedle on the Needle postulated a furry creature called a Wheedle who lived on top of the Space Needle and caused its light to flash. Its closing quatrain is: There's a Wheedle on the Needle/I know just what you're thinking/But if you look up late at night/You'll see his red nose blinking. The Wheedle had since become a fixture of Seattle, becoming for a time the mascot of the Seattle SuperSonics who played in nearby Key Arena (originally The Coliseum), before departing for Oklahoma City.
In 1982, the SkyLine level was added at a height of 100 feet (30 m). While this level had been depicted in the original plans for the Space Needle, it was not built until this time. Today, the SkyLine Banquet Facility can accommodate groups of 20–360 people.
Renovations were completed in 2000 that cost nearly five times the original price ($21 million). Renovations between 1999 and 2000 included the SkyCity restaurant, SpaceBase retail store, Skybeam installation, Observation Deck overhaul, lighting additions and repainting.
In 2000, celebrations and a fireworks show were canceled because of perceived terror threats against the structure.
On May 19, 2007, the Space Needle welcomed its 45 millionth visitor. The guest, Greg Novoa of San Francisco, received a free trip for two to Paris which included a VIP dinner at the Eiffel Tower.[13]
Every year on New Year's Eve, the Space Needle celebrates with a fireworks show at midnight that is synchronized to music. The 2007/2008 show stopped, restarted, then stopped again with the rest of the pyrotechnics needing to be detonated by hand. The pyrotechnics crew blamed the problem on a corrupted file in the customized software they use to control the timed detonations.[14]
In May 2008, the Space Needle received its first professional cleaning since the opening of the 1962 World's Fair. The monument was pressure washed by Kärcher[15] with water at a pressure of 20,000 kilopascals (2,900 psi) and a temperature of 90 °C (194 °F). No detergents were used in consideration of the Seattle Center and the EMP building.[16]As part of the celebration of its 50th anniversary, the Needle was painted "Galaxy Gold" in April 2012, the same color used when the needle was originally constructed for the 1962 World's Fair.[17] This temporary makeover, intended to last through the summer, is not the Needle's first: it had the University of Washington Huskies football team logo after the team won the 1992 Rose Bowl, appeared as a giant "Wheel of Fortune" in the late 1990s, was painted crimson after Washington State won the Apple Cup,[18] and has been seen in Seattle SuperSonics colors.

Its name "CN" originally referred to Canadian National, the railway company that built the tower. Following the railway's decision to divest non-core freight railway assets, prior to the company's privatization in 1995, it transferred the tower to the Canada Lands Company, a federal Crown corporation responsible for real estate development. Since the name CN Tower became common in daily usage, the abbreviation was eventually expanded to Canadian National Tower or Canada's National Tower. However, neither of these names is commonly used.[9]
In 1995, the CN Tower was declared one of the modern Seven Wonders of the World by the American Society of Civil Engineers. It also belongs to the World Federation of Great Towers, where it holds second-place ranking.
Monday, November 5, 2012
Griffith Observatory is in Los Angeles, California. Sitting on the south-facing slope of Mount Hollywood in L.A.'s Griffith Park, it commands a view of the Los Angeles Basin, including Downtown Los Angeles to the southeast, Hollywood to the south, and the Pacific Ocean to the southwest. The observatory is a popular tourist attraction with an extensive array of space and science-related displays.
View from a trail in Griffith Park from the south, looking north.
3,015 acres (12.20 km2) of land surrounding the observatory was donated to the City of Los Angeles by Colonel Griffith J. Griffith on December 16, 1896.[1] In his will Griffith donated funds to build an observatory, exhibit hall, and planetarium on the donated land. As a Works Progress Administration (WPA) project,[2] construction began on June 20, 1933, using a design developed by architect John C. Austin based on preliminary sketches by Russell W. Porter.[1] The observatory and accompanying exhibits were opened to the public on May 14, 1935. In its first five days of operation the observatory logged more than 13,000 visitors. Dinsmore Alter was the museum's director during its first years; today, Dr. Ed Krupp is the director of the Observatory.The first exhibit visitors encountered in 1935 was the Foucault pendulum, which was designed to demonstrate the rotation of the Earth.[3] The exhibits also included a twelve-inch (305 mm) Zeiss refracting telescope in the east dome, a triple-beam coelostat (solar telescope) in the west dome, and a thirty-eight foot relief model of the moon's north polar region.
The Griffith Observatory after renovations, June 2007.
Col. Griffith requested that the observatory include a display on evolution which was accomplished with the Cosmochron exhibit which included a narration from Caltech Professor Chester Stock and an accompanying slide show. The evolution exhibit existed from 1937 to the mid 1960s.
Also included in the original design was a planetarium under the large central dome. The first shows covered topics including the Moon, worlds of the solar system, and eclipses.
During World War II the planetarium was used to train pilots in celestial navigation. The planetarium was again used for this purpose in the 1960s to train Apollo program astronauts for the first lunar missions.
The planetarium theater was renovated in 1964 and a Mark IV Zeiss projector was installed.
View from a trail in Griffith Park from the south, looking north.
3,015 acres (12.20 km2) of land surrounding the observatory was donated to the City of Los Angeles by Colonel Griffith J. Griffith on December 16, 1896.[1] In his will Griffith donated funds to build an observatory, exhibit hall, and planetarium on the donated land. As a Works Progress Administration (WPA) project,[2] construction began on June 20, 1933, using a design developed by architect John C. Austin based on preliminary sketches by Russell W. Porter.[1] The observatory and accompanying exhibits were opened to the public on May 14, 1935. In its first five days of operation the observatory logged more than 13,000 visitors. Dinsmore Alter was the museum's director during its first years; today, Dr. Ed Krupp is the director of the Observatory.The first exhibit visitors encountered in 1935 was the Foucault pendulum, which was designed to demonstrate the rotation of the Earth.[3] The exhibits also included a twelve-inch (305 mm) Zeiss refracting telescope in the east dome, a triple-beam coelostat (solar telescope) in the west dome, and a thirty-eight foot relief model of the moon's north polar region.
The Griffith Observatory after renovations, June 2007.
Col. Griffith requested that the observatory include a display on evolution which was accomplished with the Cosmochron exhibit which included a narration from Caltech Professor Chester Stock and an accompanying slide show. The evolution exhibit existed from 1937 to the mid 1960s.
Also included in the original design was a planetarium under the large central dome. The first shows covered topics including the Moon, worlds of the solar system, and eclipses.
During World War II the planetarium was used to train pilots in celestial navigation. The planetarium was again used for this purpose in the 1960s to train Apollo program astronauts for the first lunar missions.
The planetarium theater was renovated in 1964 and a Mark IV Zeiss projector was installed.
Sunday, November 4, 2012
The World Trade Center is a site for various buildings in Lower Manhattan, New York City, United States. The original World Trade Center was a complex of seven buildings. It featured landmark twin towers, which opened on April 4, 1973 and were destroyed in the September 11 attacks of 2001. The other buildings in the complex were damaged in the attacks and eventually destroyed. The site is being rebuilt with five new skyscrapers and a memorial to the casualties of the attacks. As of November 2011, only one skyscraper has been completed; the other four are expected to be completed before 2020. One World Trade Center will be the lead building for the new complex, reaching more than 100 stories at its completion.[2] It became the tallest building in New York City on April 30, 2012, and is expected to be finished by 2013. A sixth tower is awaiting confirmation.
At the time of their completion, the original 1 World Trade Center (the North Tower) and 2 World Trade Center (the South Tower), known collectively as the Twin Towers, were the tallest buildings in the world. The other buildings included 3 WTC (the Marriott World Trade Center), 4 WTC, 5 WTC, 6 WTC (which housed United States Customs), and 7 WTC. All of these buildings were built between 1975 and 1985.
The complex was designed in the early 1960s by Minoru Yamasaki and Associates of Troy, Michigan, and Emery Roth and Sons of New York.[3] The twin 110-story towers used a tube-frame structural design. To gain approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad, which became the Port Authority Trans-Hudson (PATH). Groundbreaking for the World Trade Center took place on August 5, 1966. The North Tower was completed in December 1972 and the South Tower was finished in July 1973. The construction project involved excavating a large amount of material, which was later used as landfill to build Battery Park City on the west side of Lower Manhattan. The cost for the construction was $400 million ($2,300,000,000 in 2012 dollars).[4] The complex was located in the heart of New York City's downtown financial district and contained 13.4 million square feet (1.24 million m2) of office space.[5][6]
The Windows on the World restaurant was located on the 106th and 107th floors of 1 World Trade Center (the North Tower) while the Top of the World observation deck was located on the 107th floor of 2 World Trade Center (the South Tower). The second King Kong film was filmed in 1976 with some scenes mentioning and showing the World Trade Center.
The World Trade Center experienced a fire on February 13, 1975, a bombing on February 26, 1993 and a robbery on January 14, 1998. In 1998, the Port Authority decided to privatize the World Trade Center, leasing the buildings to a private company to manage, and awarded the lease to Silverstein Properties in July 2001.
On the morning of September 11, 2001, Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex, one into each tower, in a coordinated terrorist attack. After burning for 56 minutes, the South Tower (2) collapsed, followed a half-hour later by the North Tower (1), with the attacks on the World Trade Center resulting in 2,753 deaths.[7] 7 World Trade Center collapsed later in the day and the other buildings, although they did not collapse, had to be demolished because they were damaged beyond repair. The process of cleanup and recovery at the World Trade Center site took eight months.
Over the following years, plans for a rebuilt World Trade Center took form. The first new building at the site was 7 World Trade Center, which opened in May 2006. The Lower Manhattan Development Corporation (LMDC), established in November 2001 to oversee the rebuilding process, organized competitions to select a site plan and memorial design. Memory Foundations, designed by Daniel Libeskind, was selected as the master plan, but this went through substantial changes in design. The new World Trade Center complex will include One World Trade Center, three other high-rise office towers, and the National September 11 Memorial & Museum.In March 1965, the Port Authority began acquiring property at the World Trade Center site.[40] Demolition work began on March 21, 1966, to clear thirteen square blocks of low rise buildings in Radio Row for construction of the World Trade Center.[41] Groundbreaking for the construction of the World Trade Center took place on August 5, 1966.[42]
The site of the World Trade Center was located on landfill with the bedrock located 65 feet (20 m) below.[43] To construct the World Trade Center, it was necessary to build a "bathtub" with a slurry wall around the West Street side of the site, to keep water from the Hudson River out.[44] The slurry method selected by Port Authority's chief engineer, John M. Kyle, Jr., involved digging a trench, and as excavation proceeded, filling the space with a "slurry" mixture composed of bentonite and water, which plugged holes and kept groundwater out. When the trench was dug out, a steel cage was inserted and concrete was poured in, forcing the "slurry" out. It took fourteen months for the slurry wall to be completed; it was necessary before excavation of material from the interior of the site could begin.[45] The 1.2 million cubic yards (917,000 m3) of material excavated were used (along with other fill and dredge material) to expand the Manhattan shoreline across West Street to form Battery Park City.[46][47]
In January 1967, the Port Authority awarded $74 million in contracts to various steel suppliers, and Karl Koch was hired to erect the steel.[48] Tishman Realty & Construction was hired in February 1967 to oversee construction of the project.[49] Construction work began on the North Tower in August 1968; construction on the South Tower was underway by January 1969.[50] The original Hudson Tubes, carrying PATH trains into Hudson Terminal, remained in service as elevated tunnels during the construction process until 1971 when a new PATH station opened.[51]
The topping out ceremony of 1 WTC (North Tower) took place on December 23, 1970, while 2 WTC's ceremony (South Tower) occurred later on July 19, 1971.[50] The first tenants moved into the North Tower in December 1970; the South Tower accepted tenants in January 1972.[52] When the World Trade Center twin towers were completed, the total costs to the Port Authority had reached $900 million.[53] The ribbon cutting ceremony was on April 4, 1973.[54]On September 11, 2001, terrorists hijacked American Airlines Flight 11 and crashed it into the northern façade of the North Tower at 8:46:40 a.m., the aircraft striking between the 93rd and 99th floors. Seventeen minutes later, at 9:03:11 a.m., a second team of terrorists crashed the similarly hijacked United Airlines Flight 175 into the South Tower, striking it between the 77th and 85th floors.[116] The damage caused to the North Tower by Flight 11 destroyed any means of escape from above the impact zone, trapping 1,344 people.[117] Flight 175 had a much more off-centered impact compared to Flight 11, and a single stairwell was left intact; however, only a few people managed to pass through it successfully before the tower collapsed. Although the South Tower was struck lower than the North Tower, thus affecting more floors, a smaller number, fewer than 700, were killed instantly or trapped.[118]
At 9:59 a.m., the South Tower collapsed after burning for approximately 56 minutes. The fire caused steel structural elements, already weakened from the plane impact, to fail. The North Tower collapsed at 10:28 a.m., after burning for approximately 102 minutes.[119] At 5:20 p.m.[120] on September 11, 2001, 7 World Trade Center started to collapse with the crumble of the east penthouse, and it collapsed completely at 5:21 p.m.[120] owing to uncontrolled fires causing structural failure.[121]
The 3 World Trade Center, a Marriott hotel, was destroyed during the collapse of the two towers. The three remaining buildings in the WTC plaza were extensively damaged by debris and later were demolished.[122] The Deutsche Bank Building across Liberty Street from the World Trade Center complex was later condemned owing to the uninhabitable toxic conditions inside; it was deconstructed, with work completed in early 2011.[123][124] The Borough of Manhattan Community College's Fiterman Hall at 30 West Broadway was also condemned owing to extensive damage in the attacks and is slated for deconstruction.The process of cleanup and recovery continued 24 hours a day over a period of eight months. Debris was transported from the World Trade Center site to Fresh Kills on Staten Island, where it was further sifted. On May 30, 2002, a ceremony was held to officially mark the end of the cleanup efforts.[139] In 2002, ground was broken on construction of a new 7WTC building located just to the north of the main World Trade Center site. Since it was not part of the site master plan, Larry Silverstein was able to proceed without delay on the rebuilding of 7 World Trade Center, which was completed and officially opened in May 2006; this had been considered a priority since restoring the Consolidated Edison Cos. electrical substation in the building's lower floors was necessary to meet power demands of Lower Manhattan.[140][141][142] While 7 World Trade Center was not part of the master plan for the Twin Towers site, Silverstein and Con Edison recognized that the rebuilding of 7 World Trade Center would have to be consistent with the master plan which was expected to re-open the street grid which had been blocked by the original World Trade Center super-block. As a result, the design for the new 7 World Trade Center allowed for the re-opening of Greenwich Street, which had been blocked by the original 7 World Trade Center.[143] A temporary PATH station at the World Trade Center opened in November 2003; it will be replaced by a permanent station designed by Santiago Calatrava.[144]
With the main World Trade Center site, numerous stakeholders were involved including Silverstein and the Port Authority, which in turn meant the Governor of New York State, George Pataki, had some authority. In addition, the victims' families, people in the surrounding neighborhoods, Mayor Michael Bloomberg, and others wanted input. Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001 as an official commission to oversee the rebuilding process.[145] The LMDC held a competition to solicit possible designs for the site. The Memory Foundations design by Daniel Libeskind was chosen as the master plan for the World Trade Center site.[146] The plan included the 1,776 feet (541 m) Freedom Tower (now known as One World Trade Center) as well as a memorial and a number of other office towers. Out of the World Trade Center Site Memorial Competition, a design by Michael Arad and Peter Walker titled Reflecting Absence was selected in January 2004.[147]
On March 13, 2006, workers arrived at the World Trade Center site to remove remaining debris and start surveying work. This marked the official start of construction of the National September 11 Memorial & Museum, though not without controversy and concerns from some family members.[148] In April 2006, the Port Authority and Larry Silverstein reached an agreement in which Silverstein ceded rights to develop the Freedom Tower and Tower Five in exchange for financing with Liberty Bonds for Towers Two, Three, and Four.[149][150] On April 27, 2006, a ground-breaking ceremony was held for the Freedom Tower.[151]
In May 2006, architects Richard Rogers and Fumihiko Maki were announced as the architects for Towers Three and Four, respectively.[152] The final designs for Towers Two, Three and Four were unveiled on September 7, 2006. Tower Two, or 200 Greenwich Street, will have a roof height of 1,254 feet (382 m) and a 96 feet (29 m) tripod spire for a total of 1,350 feet (410 m). Tower Three, or 175 Greenwich Street will have a roof height of 1,155 feet (352 m) and an antenna height reaching 1,255 feet (383 m). Tower Four, or 150 Greenwich Street, will have an overall height of 946 feet (288 m).[153] On June 22, 2007, the Port Authority of New York and New Jersey announced that JP Morgan Chase will build Tower 5, a 42-story building on Site 5 occupied by the Deutsche Bank Building,[154] and Kohn Pedersen Fox was selected as the architect for the building.[155] Four renowned architects, including Spanish architect Santiago Calatrava, who designed the transit hub, One WTC designer David Childs of Skidmore, Owings and Merrill, and the famed British architect Norman Foster of Foster and Partners designed Tower Two and masterminded the iconic diamond design, will greatly enhance the street-level atmosphere of the rebuilt site. The projects will be complete between early 2013 to mid 2014.[156]
As of August 2011, One World Trade Center is at 80 stories with glass up to the 54th floor, Tower Four is up around 38 stories with glass up to the 15th floor, and the former Deutsche Bank Building has been completely dismantled and the Port Authority is working on their Vehicle Security Center.[157] The World Trade Center Transportation Hub's PATH hall is nearly complete. The memorial officially opened to relatives of the deceased on September 11, 2011, and to the general public on September 12. World Trade Center Tower Three's foundations are becoming visible, and will be completed in mid 2014 if Silverstein Properties can meet requirements set by the Port Authority, as they very likely will.[158][159] Tower Two will also be completed on schedule according to the construction company. In the December of 2011, Tower Two's foundations are finished and is starting to assemble the frame. [160] Because numerous American and Chinese companies are "very interested" in leasing space at the WTC, Two World Trade Center is likely to be finished earlier than expected.[161] Publishing Giant Conde Nast has agreed to move its headquarters to One World Trade Center, and with this shift, many more are expected to follow.[162][125]
In the immediate aftermath of the attacks, media reports suggested that tens of thousands might have been killed in the attacks, as over 50,000 people could be inside the towers. Ultimately, 2,753 death certificates (excluding those for hijackers) were filed relating to the 9/11 attacks in New York, including one filed for Felicia Dunn-Jones, who was added to the official death toll in May 2007; Dunn-Jones died five months later from a lung condition linked to exposure to dust during the collapse of the World Trade Center.[126] Three other victims were then added to the official death toll by the city medical examiner's office: Dr. Sneha Anne Philip, who was last seen the day before the attacks; Leon Heyward, a man who developed lymphoma and subsequently died in 2008 as a result of dust ingestion during the events following the attacks to the Twin Towers;[127][128] and Jerry Borg, who died in December 2010 of pulmonary sarcoidosis determined in June 2011 to be the result of dust from the attacks.[7] Cantor Fitzgerald L.P., an investment bank on the 101st–105th floors of One World Trade Center, lost 658 employees, considerably more than any other employer,[129] while Marsh & McLennan Companies, located immediately below Cantor Fitzgerald on floors 93–101 (the location of Flight 11's impact), lost 295 employees, and 175 employees of Aon Corporation were killed.[130] In addition, 343 of the dead were New York City firefighters, 84 were Port Authority employees, of whom 37 were members of the Port Authority Police Department, and another 23 were New York City Police Department officers.[131][132][133] Ten years after the attacks, only 1,629 victims have been identified.[134] Of all the people who were still in the towers when they collapsed, only 20 were pulled out alive. PAPD Officers William Jimeno and Sgt. John McLoughlin were survivors 18 and 19.[135]
At the time of their completion, the original 1 World Trade Center (the North Tower) and 2 World Trade Center (the South Tower), known collectively as the Twin Towers, were the tallest buildings in the world. The other buildings included 3 WTC (the Marriott World Trade Center), 4 WTC, 5 WTC, 6 WTC (which housed United States Customs), and 7 WTC. All of these buildings were built between 1975 and 1985.
The complex was designed in the early 1960s by Minoru Yamasaki and Associates of Troy, Michigan, and Emery Roth and Sons of New York.[3] The twin 110-story towers used a tube-frame structural design. To gain approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad, which became the Port Authority Trans-Hudson (PATH). Groundbreaking for the World Trade Center took place on August 5, 1966. The North Tower was completed in December 1972 and the South Tower was finished in July 1973. The construction project involved excavating a large amount of material, which was later used as landfill to build Battery Park City on the west side of Lower Manhattan. The cost for the construction was $400 million ($2,300,000,000 in 2012 dollars).[4] The complex was located in the heart of New York City's downtown financial district and contained 13.4 million square feet (1.24 million m2) of office space.[5][6]
The Windows on the World restaurant was located on the 106th and 107th floors of 1 World Trade Center (the North Tower) while the Top of the World observation deck was located on the 107th floor of 2 World Trade Center (the South Tower). The second King Kong film was filmed in 1976 with some scenes mentioning and showing the World Trade Center.
The World Trade Center experienced a fire on February 13, 1975, a bombing on February 26, 1993 and a robbery on January 14, 1998. In 1998, the Port Authority decided to privatize the World Trade Center, leasing the buildings to a private company to manage, and awarded the lease to Silverstein Properties in July 2001.
On the morning of September 11, 2001, Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex, one into each tower, in a coordinated terrorist attack. After burning for 56 minutes, the South Tower (2) collapsed, followed a half-hour later by the North Tower (1), with the attacks on the World Trade Center resulting in 2,753 deaths.[7] 7 World Trade Center collapsed later in the day and the other buildings, although they did not collapse, had to be demolished because they were damaged beyond repair. The process of cleanup and recovery at the World Trade Center site took eight months.
Over the following years, plans for a rebuilt World Trade Center took form. The first new building at the site was 7 World Trade Center, which opened in May 2006. The Lower Manhattan Development Corporation (LMDC), established in November 2001 to oversee the rebuilding process, organized competitions to select a site plan and memorial design. Memory Foundations, designed by Daniel Libeskind, was selected as the master plan, but this went through substantial changes in design. The new World Trade Center complex will include One World Trade Center, three other high-rise office towers, and the National September 11 Memorial & Museum.In March 1965, the Port Authority began acquiring property at the World Trade Center site.[40] Demolition work began on March 21, 1966, to clear thirteen square blocks of low rise buildings in Radio Row for construction of the World Trade Center.[41] Groundbreaking for the construction of the World Trade Center took place on August 5, 1966.[42]
The site of the World Trade Center was located on landfill with the bedrock located 65 feet (20 m) below.[43] To construct the World Trade Center, it was necessary to build a "bathtub" with a slurry wall around the West Street side of the site, to keep water from the Hudson River out.[44] The slurry method selected by Port Authority's chief engineer, John M. Kyle, Jr., involved digging a trench, and as excavation proceeded, filling the space with a "slurry" mixture composed of bentonite and water, which plugged holes and kept groundwater out. When the trench was dug out, a steel cage was inserted and concrete was poured in, forcing the "slurry" out. It took fourteen months for the slurry wall to be completed; it was necessary before excavation of material from the interior of the site could begin.[45] The 1.2 million cubic yards (917,000 m3) of material excavated were used (along with other fill and dredge material) to expand the Manhattan shoreline across West Street to form Battery Park City.[46][47]
In January 1967, the Port Authority awarded $74 million in contracts to various steel suppliers, and Karl Koch was hired to erect the steel.[48] Tishman Realty & Construction was hired in February 1967 to oversee construction of the project.[49] Construction work began on the North Tower in August 1968; construction on the South Tower was underway by January 1969.[50] The original Hudson Tubes, carrying PATH trains into Hudson Terminal, remained in service as elevated tunnels during the construction process until 1971 when a new PATH station opened.[51]
The topping out ceremony of 1 WTC (North Tower) took place on December 23, 1970, while 2 WTC's ceremony (South Tower) occurred later on July 19, 1971.[50] The first tenants moved into the North Tower in December 1970; the South Tower accepted tenants in January 1972.[52] When the World Trade Center twin towers were completed, the total costs to the Port Authority had reached $900 million.[53] The ribbon cutting ceremony was on April 4, 1973.[54]On September 11, 2001, terrorists hijacked American Airlines Flight 11 and crashed it into the northern façade of the North Tower at 8:46:40 a.m., the aircraft striking between the 93rd and 99th floors. Seventeen minutes later, at 9:03:11 a.m., a second team of terrorists crashed the similarly hijacked United Airlines Flight 175 into the South Tower, striking it between the 77th and 85th floors.[116] The damage caused to the North Tower by Flight 11 destroyed any means of escape from above the impact zone, trapping 1,344 people.[117] Flight 175 had a much more off-centered impact compared to Flight 11, and a single stairwell was left intact; however, only a few people managed to pass through it successfully before the tower collapsed. Although the South Tower was struck lower than the North Tower, thus affecting more floors, a smaller number, fewer than 700, were killed instantly or trapped.[118]
At 9:59 a.m., the South Tower collapsed after burning for approximately 56 minutes. The fire caused steel structural elements, already weakened from the plane impact, to fail. The North Tower collapsed at 10:28 a.m., after burning for approximately 102 minutes.[119] At 5:20 p.m.[120] on September 11, 2001, 7 World Trade Center started to collapse with the crumble of the east penthouse, and it collapsed completely at 5:21 p.m.[120] owing to uncontrolled fires causing structural failure.[121]
The 3 World Trade Center, a Marriott hotel, was destroyed during the collapse of the two towers. The three remaining buildings in the WTC plaza were extensively damaged by debris and later were demolished.[122] The Deutsche Bank Building across Liberty Street from the World Trade Center complex was later condemned owing to the uninhabitable toxic conditions inside; it was deconstructed, with work completed in early 2011.[123][124] The Borough of Manhattan Community College's Fiterman Hall at 30 West Broadway was also condemned owing to extensive damage in the attacks and is slated for deconstruction.The process of cleanup and recovery continued 24 hours a day over a period of eight months. Debris was transported from the World Trade Center site to Fresh Kills on Staten Island, where it was further sifted. On May 30, 2002, a ceremony was held to officially mark the end of the cleanup efforts.[139] In 2002, ground was broken on construction of a new 7WTC building located just to the north of the main World Trade Center site. Since it was not part of the site master plan, Larry Silverstein was able to proceed without delay on the rebuilding of 7 World Trade Center, which was completed and officially opened in May 2006; this had been considered a priority since restoring the Consolidated Edison Cos. electrical substation in the building's lower floors was necessary to meet power demands of Lower Manhattan.[140][141][142] While 7 World Trade Center was not part of the master plan for the Twin Towers site, Silverstein and Con Edison recognized that the rebuilding of 7 World Trade Center would have to be consistent with the master plan which was expected to re-open the street grid which had been blocked by the original World Trade Center super-block. As a result, the design for the new 7 World Trade Center allowed for the re-opening of Greenwich Street, which had been blocked by the original 7 World Trade Center.[143] A temporary PATH station at the World Trade Center opened in November 2003; it will be replaced by a permanent station designed by Santiago Calatrava.[144]
With the main World Trade Center site, numerous stakeholders were involved including Silverstein and the Port Authority, which in turn meant the Governor of New York State, George Pataki, had some authority. In addition, the victims' families, people in the surrounding neighborhoods, Mayor Michael Bloomberg, and others wanted input. Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001 as an official commission to oversee the rebuilding process.[145] The LMDC held a competition to solicit possible designs for the site. The Memory Foundations design by Daniel Libeskind was chosen as the master plan for the World Trade Center site.[146] The plan included the 1,776 feet (541 m) Freedom Tower (now known as One World Trade Center) as well as a memorial and a number of other office towers. Out of the World Trade Center Site Memorial Competition, a design by Michael Arad and Peter Walker titled Reflecting Absence was selected in January 2004.[147]
On March 13, 2006, workers arrived at the World Trade Center site to remove remaining debris and start surveying work. This marked the official start of construction of the National September 11 Memorial & Museum, though not without controversy and concerns from some family members.[148] In April 2006, the Port Authority and Larry Silverstein reached an agreement in which Silverstein ceded rights to develop the Freedom Tower and Tower Five in exchange for financing with Liberty Bonds for Towers Two, Three, and Four.[149][150] On April 27, 2006, a ground-breaking ceremony was held for the Freedom Tower.[151]
In May 2006, architects Richard Rogers and Fumihiko Maki were announced as the architects for Towers Three and Four, respectively.[152] The final designs for Towers Two, Three and Four were unveiled on September 7, 2006. Tower Two, or 200 Greenwich Street, will have a roof height of 1,254 feet (382 m) and a 96 feet (29 m) tripod spire for a total of 1,350 feet (410 m). Tower Three, or 175 Greenwich Street will have a roof height of 1,155 feet (352 m) and an antenna height reaching 1,255 feet (383 m). Tower Four, or 150 Greenwich Street, will have an overall height of 946 feet (288 m).[153] On June 22, 2007, the Port Authority of New York and New Jersey announced that JP Morgan Chase will build Tower 5, a 42-story building on Site 5 occupied by the Deutsche Bank Building,[154] and Kohn Pedersen Fox was selected as the architect for the building.[155] Four renowned architects, including Spanish architect Santiago Calatrava, who designed the transit hub, One WTC designer David Childs of Skidmore, Owings and Merrill, and the famed British architect Norman Foster of Foster and Partners designed Tower Two and masterminded the iconic diamond design, will greatly enhance the street-level atmosphere of the rebuilt site. The projects will be complete between early 2013 to mid 2014.[156]
As of August 2011, One World Trade Center is at 80 stories with glass up to the 54th floor, Tower Four is up around 38 stories with glass up to the 15th floor, and the former Deutsche Bank Building has been completely dismantled and the Port Authority is working on their Vehicle Security Center.[157] The World Trade Center Transportation Hub's PATH hall is nearly complete. The memorial officially opened to relatives of the deceased on September 11, 2011, and to the general public on September 12. World Trade Center Tower Three's foundations are becoming visible, and will be completed in mid 2014 if Silverstein Properties can meet requirements set by the Port Authority, as they very likely will.[158][159] Tower Two will also be completed on schedule according to the construction company. In the December of 2011, Tower Two's foundations are finished and is starting to assemble the frame. [160] Because numerous American and Chinese companies are "very interested" in leasing space at the WTC, Two World Trade Center is likely to be finished earlier than expected.[161] Publishing Giant Conde Nast has agreed to move its headquarters to One World Trade Center, and with this shift, many more are expected to follow.[162][125]
In the immediate aftermath of the attacks, media reports suggested that tens of thousands might have been killed in the attacks, as over 50,000 people could be inside the towers. Ultimately, 2,753 death certificates (excluding those for hijackers) were filed relating to the 9/11 attacks in New York, including one filed for Felicia Dunn-Jones, who was added to the official death toll in May 2007; Dunn-Jones died five months later from a lung condition linked to exposure to dust during the collapse of the World Trade Center.[126] Three other victims were then added to the official death toll by the city medical examiner's office: Dr. Sneha Anne Philip, who was last seen the day before the attacks; Leon Heyward, a man who developed lymphoma and subsequently died in 2008 as a result of dust ingestion during the events following the attacks to the Twin Towers;[127][128] and Jerry Borg, who died in December 2010 of pulmonary sarcoidosis determined in June 2011 to be the result of dust from the attacks.[7] Cantor Fitzgerald L.P., an investment bank on the 101st–105th floors of One World Trade Center, lost 658 employees, considerably more than any other employer,[129] while Marsh & McLennan Companies, located immediately below Cantor Fitzgerald on floors 93–101 (the location of Flight 11's impact), lost 295 employees, and 175 employees of Aon Corporation were killed.[130] In addition, 343 of the dead were New York City firefighters, 84 were Port Authority employees, of whom 37 were members of the Port Authority Police Department, and another 23 were New York City Police Department officers.[131][132][133] Ten years after the attacks, only 1,629 victims have been identified.[134] Of all the people who were still in the towers when they collapsed, only 20 were pulled out alive. PAPD Officers William Jimeno and Sgt. John McLoughlin were survivors 18 and 19.[135]
Saturday, November 3, 2012
La Masia de Can Planes, usually shortened to La Masia, (Catalan pronunciation: [ɫə məˈzi.ə], English: "The Farmhouse"),[1] is the name given to FC Barcelona's training facilities located near the Camp Nou in the Les Corts district of Barcelona, and is often used to generically describe the youth academy of Barcelona.
The youth academy of Barcelona holds more than 300 young players, and has been praised since 2002 as one of the best in the world, being a significant factor in FC Barcelona's European success as well as the Spanish national team's success at the 2010 FIFA World Cup. In 2010, la Masia achieved a record breaking honour becoming the first youth academy to have trained all three finalists for the Ballon d'Or in one same year, with Andrés Iniesta, Lionel Messi and Xavi Hernández.[2]
The building itself is an ancient country residence (In Catalan: masia) built in 1702, and once Camp Nou was inaugurated in 1957, the building was remodelled and extended for use as the club's social headquarters. With the gradual expansion of the club, the building became too small for headquarters, and, on 20 October 1979, La Masia was converted into a dormitory for young players from outside of Barcelona. On June, 30, 2011 the Masia building ceased housing the young sportsmen who are trained to become a part of the Club’s professional teams. In a simple, but emotionally charged ceremony, the doors were closed and the new Masia-Centre de Formació Oriol Tort, at the Ciutat Esportiva Joan Gamper, took over the function of the residential center for the youngsters.La Masia was an old country residence, built in 1702, before its purchase by FC Barcelona in 1954. The football club initially used La Masia as a workshop for the architects, engineers and constructors of its new stadium, Camp Nou. After Camp Nou was inaugurated on 24 September 1957, La Masia was closed down. Under the presidency of Enric Llaudet, the building was remodeled and extended; it reopened as an office for the club's headquarters on 26 September 1966. La Masia could not accommodate the increasing number of employees as the club grew, and president Josep Núñez remodelled it in 1979 to house a young academy of players who came from outside of Barcelona.[3][4] The idea for the youth academy was proposed to Núñez by Johan Cruyff, a former player who was a youth-product from the Ajax Academy. Núñez installed Oriol Tort as director.[5]
One of the first graduates of the academy was the midfielder Guillermo Amor, who débuted in 1988. Amor went on to play 311 La Liga matches for the first team. Two years later, he was followed by goalkeeper Carles Busquets and midfielder Pep Guardiola.[6] All three made their first team début under Cruyff, who was made manager of the first team in 1988. The team played to Cruyff's tiki-taka philosophy, derived from total football, which has often been attributed as a key component in Barcelona's later success and international appeal.[7][8][9] Guardiola matured into a total-football midfielder, and became a source of inspiration for later midfielders from La Masia, such as Xavi Hernández, Andrés Iniesta and Cesc Fàbregas.[10] Xavi, who was Guardiola's understudy for three years, said in 2010 that he once considered transferring abroad because of the pressure and high expectations placed on him to fill Guardiola's role in the midfield.[11]
Guardiola was appointed the new coach of FC Barcelona B in May 2007. At that time, the team was in organisational disarray as it entered the fourth tier of Spanish football. The relegation of the B team was a cause in the disbanding of FC Barcelona C, which played in that league. In Guardiola's re-organisation of the reserve side, he made places available in Barcelona B to players above the age of 21; his aim was to increase competition within the team and help it advance into a more competitive league. He divided the players into two categories: "pearls", which was composed of the young players, and the "backbone", which was mostly composed of those who were more mature. The "backbone players" were between 21 and 26 years old and they stayed in the B team for a maximum of two years before being sold. Guardiola said the two-year duration was to allow for room to constantly develop youth players.[5]
After re-organising the youth side, Guardiola convinced club president Laporta of the need for better training facilities, and the youth teams moved to La Ciutat Esportiva Joan Gamper, where Laporta had various technical laboratories installed so the coaches could follow the training more closely. By the end of the 2007–08 season, Barcelona B was promoted to the third tier, Segunda B, and, at the end of 2009–10, to the second tier Segunda, which was the top-tier for a reserve team (the first-team plays in the Primera Division).[5]
La Masia received more publicity after Barcelona B's success with homegrown players; Rory Smith reported in The Daily Telegraph that La Masia "has replaced the fabled Ajax Academy as football's foremost production line."[12] The recent fame and success of La Masia as a talent school was ascribed by Ian Hawkey of The Times to the class of 1987, which featured prominent members as Cesc Fàbregas, Lionel Messi, Gerard Piqué and Pedro Rodríguez.[13] In 2000, Louis van Gaal, coach of FC Barcelona's first team, was widely ridiculed by the city sports media for his dream to win the Champions League with 11 home-grown players. The first team won the trophy in 2009 with eight home-grown players.[5]
In the 30 years since La Masia's inauguration, more than 500 youngsters have left their homes and families to stay at the academy. About half of them were from Catalonia, and the rest came from other regions of the Kingdom of Spain and beyond, including 15 from Cameroon, 7 from Brazil, 5 from Senegal and 3 from Argentina. Of those 500, about 10 percent made it into the first team.[
The youth academy of Barcelona holds more than 300 young players, and has been praised since 2002 as one of the best in the world, being a significant factor in FC Barcelona's European success as well as the Spanish national team's success at the 2010 FIFA World Cup. In 2010, la Masia achieved a record breaking honour becoming the first youth academy to have trained all three finalists for the Ballon d'Or in one same year, with Andrés Iniesta, Lionel Messi and Xavi Hernández.[2]
The building itself is an ancient country residence (In Catalan: masia) built in 1702, and once Camp Nou was inaugurated in 1957, the building was remodelled and extended for use as the club's social headquarters. With the gradual expansion of the club, the building became too small for headquarters, and, on 20 October 1979, La Masia was converted into a dormitory for young players from outside of Barcelona. On June, 30, 2011 the Masia building ceased housing the young sportsmen who are trained to become a part of the Club’s professional teams. In a simple, but emotionally charged ceremony, the doors were closed and the new Masia-Centre de Formació Oriol Tort, at the Ciutat Esportiva Joan Gamper, took over the function of the residential center for the youngsters.La Masia was an old country residence, built in 1702, before its purchase by FC Barcelona in 1954. The football club initially used La Masia as a workshop for the architects, engineers and constructors of its new stadium, Camp Nou. After Camp Nou was inaugurated on 24 September 1957, La Masia was closed down. Under the presidency of Enric Llaudet, the building was remodeled and extended; it reopened as an office for the club's headquarters on 26 September 1966. La Masia could not accommodate the increasing number of employees as the club grew, and president Josep Núñez remodelled it in 1979 to house a young academy of players who came from outside of Barcelona.[3][4] The idea for the youth academy was proposed to Núñez by Johan Cruyff, a former player who was a youth-product from the Ajax Academy. Núñez installed Oriol Tort as director.[5]
One of the first graduates of the academy was the midfielder Guillermo Amor, who débuted in 1988. Amor went on to play 311 La Liga matches for the first team. Two years later, he was followed by goalkeeper Carles Busquets and midfielder Pep Guardiola.[6] All three made their first team début under Cruyff, who was made manager of the first team in 1988. The team played to Cruyff's tiki-taka philosophy, derived from total football, which has often been attributed as a key component in Barcelona's later success and international appeal.[7][8][9] Guardiola matured into a total-football midfielder, and became a source of inspiration for later midfielders from La Masia, such as Xavi Hernández, Andrés Iniesta and Cesc Fàbregas.[10] Xavi, who was Guardiola's understudy for three years, said in 2010 that he once considered transferring abroad because of the pressure and high expectations placed on him to fill Guardiola's role in the midfield.[11]
Guardiola was appointed the new coach of FC Barcelona B in May 2007. At that time, the team was in organisational disarray as it entered the fourth tier of Spanish football. The relegation of the B team was a cause in the disbanding of FC Barcelona C, which played in that league. In Guardiola's re-organisation of the reserve side, he made places available in Barcelona B to players above the age of 21; his aim was to increase competition within the team and help it advance into a more competitive league. He divided the players into two categories: "pearls", which was composed of the young players, and the "backbone", which was mostly composed of those who were more mature. The "backbone players" were between 21 and 26 years old and they stayed in the B team for a maximum of two years before being sold. Guardiola said the two-year duration was to allow for room to constantly develop youth players.[5]
After re-organising the youth side, Guardiola convinced club president Laporta of the need for better training facilities, and the youth teams moved to La Ciutat Esportiva Joan Gamper, where Laporta had various technical laboratories installed so the coaches could follow the training more closely. By the end of the 2007–08 season, Barcelona B was promoted to the third tier, Segunda B, and, at the end of 2009–10, to the second tier Segunda, which was the top-tier for a reserve team (the first-team plays in the Primera Division).[5]
La Masia received more publicity after Barcelona B's success with homegrown players; Rory Smith reported in The Daily Telegraph that La Masia "has replaced the fabled Ajax Academy as football's foremost production line."[12] The recent fame and success of La Masia as a talent school was ascribed by Ian Hawkey of The Times to the class of 1987, which featured prominent members as Cesc Fàbregas, Lionel Messi, Gerard Piqué and Pedro Rodríguez.[13] In 2000, Louis van Gaal, coach of FC Barcelona's first team, was widely ridiculed by the city sports media for his dream to win the Champions League with 11 home-grown players. The first team won the trophy in 2009 with eight home-grown players.[5]
In the 30 years since La Masia's inauguration, more than 500 youngsters have left their homes and families to stay at the academy. About half of them were from Catalonia, and the rest came from other regions of the Kingdom of Spain and beyond, including 15 from Cameroon, 7 from Brazil, 5 from Senegal and 3 from Argentina. Of those 500, about 10 percent made it into the first team.[
The Olympic Stadium in Olympic Park in Stratford, London, England was the centrepiece of the 2012 Summer Olympics, the last stop in the 2012 Olympics torch relay, and the venue of the athletic events as well as the opening and closing ceremonies. It was the central venue of the 2012 Summer Paralympics.
It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.
Land preparation for the stadium began in mid-2007, with the official construction start date on 22 May 2008, although piling works for the foundation unofficially began four weeks ahead of that date. The stadium will also host the 2017 World Championships in Athletics.London originally bid to host the 2015 World Athletics Championships using the Olympic Stadium. It went up against Beijing's Olympic Stadium and the Polish city of Chorzów. However, the stadium had to pull out of the running of hosting the championships due to the uncertainty of the stadium, due to the timing of the announcement of who would operate the stadium after the Olympics, thus gifting Beijing the championships.[72] With the issues resolved over the stadium's future, London again used the stadium to bid for the 2017 World Athletics Championships.[73] The bid was made official in August with Lord Coe personally submitting the bid a few weeks later at the 2011 World Athletic Championships in Daegu. London's Mayor Boris Johnson and the British government have backed the bid.[74] Following Tottenham winning the right to a review on 18 October 2011, just three weeks before the IAAF vote on the 2017 championships host, Lord Coe, on 25 August 2011 stated that the bid would be unaffected by the legal battle. UK Athletics chairman Ed Warner added, "Whatever the outcome of that process there is going to be a track in that stadium and that's what matters and that's the commitment we're making to the IAAF."[49] On 11 November 2011, the IAAF officially awarded the 2017 World Championships to London.[75]
In October 2012 it was reveled that London was the only formal bidder for the IPC World Athletics Championships. Discussions were underway between UK Athletics and the Greater London Authority (GLA) and the International Paralympic Committee (IPC) before the success of the 2012 Summer Paralympics. The original plan was for the championships to be held at the Alexander Stadium in Birmingham, but the GLA will make up any of the additional cost to hold it in London. The deal would be the first time that the Paralympic and able bodied World Athletics Championships would be held in the same location. The IPC World Championships are stated to take place a month before the abled bodied event.
It is located at Marshgate Lane in London's Stratford district in the Lower Lea Valley. The stadium has a capacity of 80,000, making it the third-largest stadium in England behind Wembley Stadium and Twickenham Stadium.
Land preparation for the stadium began in mid-2007, with the official construction start date on 22 May 2008, although piling works for the foundation unofficially began four weeks ahead of that date. The stadium will also host the 2017 World Championships in Athletics.London originally bid to host the 2015 World Athletics Championships using the Olympic Stadium. It went up against Beijing's Olympic Stadium and the Polish city of Chorzów. However, the stadium had to pull out of the running of hosting the championships due to the uncertainty of the stadium, due to the timing of the announcement of who would operate the stadium after the Olympics, thus gifting Beijing the championships.[72] With the issues resolved over the stadium's future, London again used the stadium to bid for the 2017 World Athletics Championships.[73] The bid was made official in August with Lord Coe personally submitting the bid a few weeks later at the 2011 World Athletic Championships in Daegu. London's Mayor Boris Johnson and the British government have backed the bid.[74] Following Tottenham winning the right to a review on 18 October 2011, just three weeks before the IAAF vote on the 2017 championships host, Lord Coe, on 25 August 2011 stated that the bid would be unaffected by the legal battle. UK Athletics chairman Ed Warner added, "Whatever the outcome of that process there is going to be a track in that stadium and that's what matters and that's the commitment we're making to the IAAF."[49] On 11 November 2011, the IAAF officially awarded the 2017 World Championships to London.[75]
In October 2012 it was reveled that London was the only formal bidder for the IPC World Athletics Championships. Discussions were underway between UK Athletics and the Greater London Authority (GLA) and the International Paralympic Committee (IPC) before the success of the 2012 Summer Paralympics. The original plan was for the championships to be held at the Alexander Stadium in Birmingham, but the GLA will make up any of the additional cost to hold it in London. The deal would be the first time that the Paralympic and able bodied World Athletics Championships would be held in the same location. The IPC World Championships are stated to take place a month before the abled bodied event.
Mestalla Stadium (Spanish: Estadio de Mestalla, Valencian: Estadi de Mestalla) is a football stadium in Valencia, Spain. The stadium is the home ground of Valencia Club de Fútbol. With a capacity of 55,000 seats, it ranks as the fifth-largest stadium in Spain. It is also renowned for its steep terracing and being one of the most intimidating atmospheres in all of Europe in which to play.On 20 May 1923, the Estadio Mestalla was inaugurated with a friendly match that brought Valencia CF and Levante UD face to face. It was the beginning of a new era a farewell to the Algirós, which will always remain in the memories of Valencians as the club's first home. A long and rich history has taken played out on the field of the Mestalla since its very beginning, and before Valencia CF was in Primera División. Back then, the stadium could hold up to 17,000 spectators, and the club started to show its potential in regional championships which led to a decision by management to carry out the first renovations of the Mestalla in 1927. As a result the stadium's seating capacity was increased to 25,000. Unfortunately the stadium was severely damaged during the Spanish Civil War.
Old Trafford is a football stadium in Old Trafford, Greater Manchester, England, and the home of Manchester United. With a capacity of 75,765,[1] Old Trafford is the second-largest football stadium in England after Wembley, the third-largest in the United Kingdom[2] and the eleventh-largest in Europe. The stadium is approximately 0.5 miles (0.8 km) from Old Trafford Cricket Ground and the adjacent tram station.
The ground, nicknamed the Theatre of Dreams by Bobby Charlton, has been United's permanent residence since 1910, with the exception of an eight-year absence from 1941 to 1949, following the bombing of the stadium during the Second World War. During this period, the club shared Maine Road with local rivals Manchester City. The ground underwent several expansions in the 1990s and 2000s, including the addition of extra tiers to the North, West and East Stands, which served to return the ground almost to its original capacity of 80,000. Future expansion is likely to involve the addition of a second tier to the South Stand, which would raise the capacity to over 90,000. The stadium's record attendance was recorded in 1939, when 76,962 spectators watched the FA Cup semi-final between Wolverhampton Wanderers and Grimsby Town.
The ground has frequently hosted FA Cup semi-final matches as a neutral venue and several England international fixtures while the new Wembley Stadium was under construction. It also hosted matches at the 1966 FIFA World Cup and UEFA Euro 1996, as well as the 2003 UEFA Champions League Final. Aside from football-related uses, Old Trafford has hosted rugby league's Super League Grand Final since the league's adoption of playoffs in 1998 and the final of the 2000 Rugby League World Cup. The stadium was one of several outside Greater London to host football matches during the 2012 Summer Olympics, including women's international football for the first time in the stadium's history.Before 1902, Manchester United were known as Newton Heath, during which time they first played their football matches at North Road and then Bank Street in Clayton. However, both grounds were blighted by wretched conditions, the pitches ranging from gravel to marsh, while Bank Street suffered from clouds of fumes from its neighbouring factories.[3] Therefore, following the club's rescue from near-bankruptcy and renaming, the new chairman John Henry Davies decided in 1909 that the Bank Street ground was not fit for a team that had recently won the First Division and FA Cup, so he donated funds for the construction of a new stadium.[4] Not one to spend money frivolously, Davies scouted around Manchester for an appropriate site, before settling on a patch of land adjacent to the Bridgewater Canal, just off the north end of the Warwick Road in Old Trafford.[5]
Designed by Scottish architect Archibald Leitch, who designed several other stadia, the ground was originally designed with a capacity of 100,000 spectators and featured seating in the south stand under cover, while the remaining three stands were left as terraces and uncovered.[6] Including the purchase of the land, the construction of the stadium was originally to have cost £60,000 all told. However, as costs began to rise, to reach the intended capacity would have cost an extra £30,000 over the original estimate and, at the suggestion of club secretary J. J. Bentley, the capacity was reduced to approximately 80,000.[7][8] Nevertheless, at a time when transfer fees were still around the £1,000 mark, the cost of construction only served to reinforce the club's "Moneybags United" epithet, with which they had been tarred since Davies had taken over as chairman.[9]
In May 1908, Archibald Leitch wrote to the Cheshire Lines Committee (CLC) – who had a rail depot adjacent to the proposed site for the football ground – in an attempt to persuade them to subsidise construction of the grandstand alongside the railway line. The subsidy would have come to the sum of £10,000, to be paid back at the rate of £2,000 per annum for five years or half of the gate receipts for the grandstand each year until the loan was repaid. However, despite guarantees for the loan coming from the club itself and two local breweries, both chaired by club chairman John Henry Davies, the Cheshire Lines Committee turned the proposal down.[10] The CLC had planned to build a new station adjacent to the new stadium, with the promise of an anticipated £2,750 per annum in fares offsetting the £9,800 cost of building the station. The station – Trafford Park – was eventually built, but further down the line than originally planned.[5] The CLC later constructed a modest station with one timber-built platform immediately adjacent to the stadium and this opened on 21 August 1935. It was initially named United Football Ground,[11] but was renamed Old Trafford Football Ground in early 1936. It was served on match days only by a shuttle service of steam trains from Manchester Central railway station.[12] It is currently known as Manchester United Football Ground.[13]
Construction was carried out by Messrs Brameld and Smith of Manchester[14] and development was completed in late 1909. The stadium hosted its inaugural game on 19 February 1910, with United playing host to Liverpool. However, the home side were unable to provide their fans with a win to mark the occasion, as Liverpool won 4–3. A journalist at the game reported the stadium as "the most handsomest [sic], the most spacious and the most remarkable arena I have ever seen. As a football ground it is unrivalled in the world, it is an honour to Manchester and the home of a team who can do wonders when they are so disposed".[15]
Before the construction of Wembley Stadium in 1923, the FA Cup Final was hosted by a number of different grounds around England including Old Trafford.[16] The first of these was the 1911 FA Cup Final replay between Bradford City and Newcastle United, after the original tie at Crystal Palace finished as a no-score draw after extra time. Bradford won 1–0, the goal scored by Jimmy Speirs, in a match watched by 58,000 people.[17] The ground's second FA Cup Final was the 1915 final between Sheffield United and Chelsea. Sheffield United won the match 3–0 in front of nearly 50,000 spectators, most of whom were in the military, leading to the final being nicknamed "the Khaki Cup Final".[18] On 27 December 1920, Old Trafford played host to its largest pre-Second World War attendance for a United league match, as 70,504 spectators watched the Red Devils lose 3–1 to Aston Villa.[19] The ground hosted its first international football match later that decade, when England lost 1–0 to Scotland in front of 49,429 spectators on 17 April 1926.[20][21] Unusually, the record attendance at Old Trafford is not for a Manchester United home game. Instead, on 25 March 1939, 76,962 people watched an FA Cup semi-final between Wolverhampton Wanderers and Grimsby Town.
The ground, nicknamed the Theatre of Dreams by Bobby Charlton, has been United's permanent residence since 1910, with the exception of an eight-year absence from 1941 to 1949, following the bombing of the stadium during the Second World War. During this period, the club shared Maine Road with local rivals Manchester City. The ground underwent several expansions in the 1990s and 2000s, including the addition of extra tiers to the North, West and East Stands, which served to return the ground almost to its original capacity of 80,000. Future expansion is likely to involve the addition of a second tier to the South Stand, which would raise the capacity to over 90,000. The stadium's record attendance was recorded in 1939, when 76,962 spectators watched the FA Cup semi-final between Wolverhampton Wanderers and Grimsby Town.
The ground has frequently hosted FA Cup semi-final matches as a neutral venue and several England international fixtures while the new Wembley Stadium was under construction. It also hosted matches at the 1966 FIFA World Cup and UEFA Euro 1996, as well as the 2003 UEFA Champions League Final. Aside from football-related uses, Old Trafford has hosted rugby league's Super League Grand Final since the league's adoption of playoffs in 1998 and the final of the 2000 Rugby League World Cup. The stadium was one of several outside Greater London to host football matches during the 2012 Summer Olympics, including women's international football for the first time in the stadium's history.Before 1902, Manchester United were known as Newton Heath, during which time they first played their football matches at North Road and then Bank Street in Clayton. However, both grounds were blighted by wretched conditions, the pitches ranging from gravel to marsh, while Bank Street suffered from clouds of fumes from its neighbouring factories.[3] Therefore, following the club's rescue from near-bankruptcy and renaming, the new chairman John Henry Davies decided in 1909 that the Bank Street ground was not fit for a team that had recently won the First Division and FA Cup, so he donated funds for the construction of a new stadium.[4] Not one to spend money frivolously, Davies scouted around Manchester for an appropriate site, before settling on a patch of land adjacent to the Bridgewater Canal, just off the north end of the Warwick Road in Old Trafford.[5]
Designed by Scottish architect Archibald Leitch, who designed several other stadia, the ground was originally designed with a capacity of 100,000 spectators and featured seating in the south stand under cover, while the remaining three stands were left as terraces and uncovered.[6] Including the purchase of the land, the construction of the stadium was originally to have cost £60,000 all told. However, as costs began to rise, to reach the intended capacity would have cost an extra £30,000 over the original estimate and, at the suggestion of club secretary J. J. Bentley, the capacity was reduced to approximately 80,000.[7][8] Nevertheless, at a time when transfer fees were still around the £1,000 mark, the cost of construction only served to reinforce the club's "Moneybags United" epithet, with which they had been tarred since Davies had taken over as chairman.[9]
In May 1908, Archibald Leitch wrote to the Cheshire Lines Committee (CLC) – who had a rail depot adjacent to the proposed site for the football ground – in an attempt to persuade them to subsidise construction of the grandstand alongside the railway line. The subsidy would have come to the sum of £10,000, to be paid back at the rate of £2,000 per annum for five years or half of the gate receipts for the grandstand each year until the loan was repaid. However, despite guarantees for the loan coming from the club itself and two local breweries, both chaired by club chairman John Henry Davies, the Cheshire Lines Committee turned the proposal down.[10] The CLC had planned to build a new station adjacent to the new stadium, with the promise of an anticipated £2,750 per annum in fares offsetting the £9,800 cost of building the station. The station – Trafford Park – was eventually built, but further down the line than originally planned.[5] The CLC later constructed a modest station with one timber-built platform immediately adjacent to the stadium and this opened on 21 August 1935. It was initially named United Football Ground,[11] but was renamed Old Trafford Football Ground in early 1936. It was served on match days only by a shuttle service of steam trains from Manchester Central railway station.[12] It is currently known as Manchester United Football Ground.[13]
Construction was carried out by Messrs Brameld and Smith of Manchester[14] and development was completed in late 1909. The stadium hosted its inaugural game on 19 February 1910, with United playing host to Liverpool. However, the home side were unable to provide their fans with a win to mark the occasion, as Liverpool won 4–3. A journalist at the game reported the stadium as "the most handsomest [sic], the most spacious and the most remarkable arena I have ever seen. As a football ground it is unrivalled in the world, it is an honour to Manchester and the home of a team who can do wonders when they are so disposed".[15]
Before the construction of Wembley Stadium in 1923, the FA Cup Final was hosted by a number of different grounds around England including Old Trafford.[16] The first of these was the 1911 FA Cup Final replay between Bradford City and Newcastle United, after the original tie at Crystal Palace finished as a no-score draw after extra time. Bradford won 1–0, the goal scored by Jimmy Speirs, in a match watched by 58,000 people.[17] The ground's second FA Cup Final was the 1915 final between Sheffield United and Chelsea. Sheffield United won the match 3–0 in front of nearly 50,000 spectators, most of whom were in the military, leading to the final being nicknamed "the Khaki Cup Final".[18] On 27 December 1920, Old Trafford played host to its largest pre-Second World War attendance for a United league match, as 70,504 spectators watched the Red Devils lose 3–1 to Aston Villa.[19] The ground hosted its first international football match later that decade, when England lost 1–0 to Scotland in front of 49,429 spectators on 17 April 1926.[20][21] Unusually, the record attendance at Old Trafford is not for a Manchester United home game. Instead, on 25 March 1939, 76,962 people watched an FA Cup semi-final between Wolverhampton Wanderers and Grimsby Town.
Yankee Stadium is a stadium located in The Bronx in New York City. It is the home ballpark for the New York Yankees, one of the city's Major League Baseball (MLB) franchises. It opened at the beginning of the 2009 MLB season as a replacement for the team's previous home, the original Yankee Stadium, which opened in 1923 and closed in 2008. The new ballpark was constructed across the street, north-northeast of the 1923 Yankee Stadium, on the former site of Macombs Dam Park. The ballpark opened April 2, 2009, when the Yankees hosted a workout day in front of fans from the Bronx community. The first game at the new Yankee Stadium was a pre-season exhibition game against the Chicago Cubs played on April 3, 2009, which the Yankees won 7–4.[8] The first regular season game was played on April 16, a 10–2 Yankee loss to the Cleveland Indians.[9][10]
Much of the stadium incorporates design elements from the previous Yankee Stadium, paying homage to the Yankees' history. Although stadium construction began in August 2006, the project of building a new stadium for the Yankees is one that spanned many years and faced many controversies. The stadium was built on what had been 24 acres (97,000 m2) of public parkland. Replacement baseball fields opened in April 2012. Also controversial was the price tag of $1.5 billion,[11] which makes it not only the most expensive baseball stadium ever built, but the second-most expensive stadium of any kind (after MetLife Stadium in East Rutherford, New Jersey).[12]New York Yankees owner George Steinbrenner began campaigning for the building of a new stadium in the 1980s, even alleging unsafe conditions around the original Yankee Stadium despite the possibility that such statements could discourage attendance at his own team's games. Yankees ownership allegedly planned to move the team across the Hudson River to New Jersey. The Yankees also considered moving to the West Side of Manhattan, which was where the proposed West Side Stadium would later be considered for the New York Jets and the city's bid for the 2012 Summer Olympics.[13][14]
New York City Mayor Rudolph Giuliani had already been instrumental in the construction of taxpayer-funded minor league baseball facilities MCU Park for the Mets' minor league Brooklyn Cyclones and Richmond County Bank Ballpark for the Staten Island Yankees. Shortly before leaving office in December 2001, he announced "tentative agreements" for both the New York Yankees and New York Mets to build new stadiums. Of $1.5 billion sought for the stadiums, city and state taxpayers would pick up half the tab for construction, $800 million, along with $390 million on extra transportation.[15] The plan also said that the teams would be allowed to keep all parking revenues, which state officials had already said they wanted to keep to compensate the state for building new garages for the teams.[16] The teams would keep 96% of ticket revenues and 100% of all other revenues, not pay sales tax or property tax on the stadium, and would get low-cost electricity from the state of New York.[16] Business officials criticized the plan as giving too much money to successful teams with little reason to move to a different city.[16]
Michael Bloomberg, who succeeded Giuliani as mayor in 2002, called the former mayor's agreements "corporate welfare" and exercised the escape clause in the agreements to back out of both deals, saying that the city could not afford to build new stadiums for the Yankees and Mets. Bloomberg said that unbeknownst to him, Giuliani had inserted a clause in this deal which loosened the teams' leases with the city and would allow the Yankees and Mets to leave the city on 60 days' notice to find a new home elsewhere if the city backed out of the agreement.[15][16] At the time, Bloomberg said that publicly funded stadiums were a poor investment. Under Bloomberg, the New York City government would only offer public financing for infrastructure improvements; the teams would have to pay for the stadium themselves.
The proposal for the current stadium was unveiled by the Yankees in 2004. The team scrapped plans to build a retractable roof, saving $200 million in construction costs.
Much of the stadium incorporates design elements from the previous Yankee Stadium, paying homage to the Yankees' history. Although stadium construction began in August 2006, the project of building a new stadium for the Yankees is one that spanned many years and faced many controversies. The stadium was built on what had been 24 acres (97,000 m2) of public parkland. Replacement baseball fields opened in April 2012. Also controversial was the price tag of $1.5 billion,[11] which makes it not only the most expensive baseball stadium ever built, but the second-most expensive stadium of any kind (after MetLife Stadium in East Rutherford, New Jersey).[12]New York Yankees owner George Steinbrenner began campaigning for the building of a new stadium in the 1980s, even alleging unsafe conditions around the original Yankee Stadium despite the possibility that such statements could discourage attendance at his own team's games. Yankees ownership allegedly planned to move the team across the Hudson River to New Jersey. The Yankees also considered moving to the West Side of Manhattan, which was where the proposed West Side Stadium would later be considered for the New York Jets and the city's bid for the 2012 Summer Olympics.[13][14]
New York City Mayor Rudolph Giuliani had already been instrumental in the construction of taxpayer-funded minor league baseball facilities MCU Park for the Mets' minor league Brooklyn Cyclones and Richmond County Bank Ballpark for the Staten Island Yankees. Shortly before leaving office in December 2001, he announced "tentative agreements" for both the New York Yankees and New York Mets to build new stadiums. Of $1.5 billion sought for the stadiums, city and state taxpayers would pick up half the tab for construction, $800 million, along with $390 million on extra transportation.[15] The plan also said that the teams would be allowed to keep all parking revenues, which state officials had already said they wanted to keep to compensate the state for building new garages for the teams.[16] The teams would keep 96% of ticket revenues and 100% of all other revenues, not pay sales tax or property tax on the stadium, and would get low-cost electricity from the state of New York.[16] Business officials criticized the plan as giving too much money to successful teams with little reason to move to a different city.[16]
Michael Bloomberg, who succeeded Giuliani as mayor in 2002, called the former mayor's agreements "corporate welfare" and exercised the escape clause in the agreements to back out of both deals, saying that the city could not afford to build new stadiums for the Yankees and Mets. Bloomberg said that unbeknownst to him, Giuliani had inserted a clause in this deal which loosened the teams' leases with the city and would allow the Yankees and Mets to leave the city on 60 days' notice to find a new home elsewhere if the city backed out of the agreement.[15][16] At the time, Bloomberg said that publicly funded stadiums were a poor investment. Under Bloomberg, the New York City government would only offer public financing for infrastructure improvements; the teams would have to pay for the stadium themselves.
The proposal for the current stadium was unveiled by the Yankees in 2004. The team scrapped plans to build a retractable roof, saving $200 million in construction costs.
Anfield is a football stadium in Anfield, Liverpool, England which has a seating capacity of 45,276.[3] It has been the home of Liverpool F.C. since their formation in 1892. It was originally the home of Everton F.C. from 1884 to 1892, when they moved to Goodison Park.
The stadium has four stands: the Spion Kop, Main Stand, Centenary Stand and Anfield Road. The record attendance of 61,905, was set at a match between Liverpool and Wolverhampton Wanderers in 1952. The ground's conversion to an all-seater stadium in 1994 as a result of the Taylor Report greatly reduced its capacity.
Two gates at the ground are named after former Liverpool managers: Bill Shankly and Bob Paisley. A statue of Shankly is situated outside the stadium. The ground is 2 miles (3 km) from Liverpool Lime Street railway station.
Plans to replace Anfield with a new 60,000-capacity stadium in adjacent Stanley Park were initiated in 2002. Fenway Sports Group's acquisition of Liverpool in 2010 made the construction of a new stadium doubtful as they have said they would prefer to redevelop Anfield.Opened in 1884, Anfield was originally owned by John Orrell, a minor land owner who was a friend of an Everton F.C. member John Houlding.[5] Everton, who previously played at Priory Road, were in need of a new venue owing to the noise produced by the crowd on match days.[6] Orrell lent the pitch to the club in exchange for a small rent. The first match at the ground was between Everton and Earlestown on 28 September 1884, which Everton won 5–0.[7] During Everton's tenure at the stadium, stands were erected for some of the 8,000-plus spectators regularly attending matches, although the ground was capable of holding around 20,000 spectators and occasionally did. The ground was considered of international standard at the time, playing host to the British Home Championship match between England and Ireland in 1889. Anfield's first league match was played on 8 September 1888, between Everton and Accrington F.C. Everton quickly improved as a team, and became Anfield's first league champions in the 1890–91 season.[8]
In 1892, negotiations to purchase the land at Anfield from Orrell escalated into a dispute between Houlding and the Everton F.C. committee over how the club was run. Events culminated in Everton's move to Goodison Park.[6] Houlding was left with an empty stadium, and decided to form a new club to occupy it. The new team was called Liverpool F.C. and Athletic Grounds Ltd, and the club's first match at Anfield was a friendly played in front of 200 people on 1 September 1892, against Rotherham Town. Liverpool won 7–1.[9]
Liverpool's first Football League match at Anfield was played on 9 September 1893, against Lincoln City. Liverpool won 4–0 in front of 5,000 spectators.[10] A new stand capable of holding 3,000 spectators was constructed in 1895 on the site of the present Main Stand. Designed by architect Archibald Leitch,[11] the stand had a distinctive red and white gable, and was similar to the main stand at Newcastle United's ground St James' Park.[9] Another stand was constructed at the Anfield Road end in 1903, built from timber and corrugated iron. After Liverpool had won their second League championship in 1906, a new stand was built along the Walton Breck Road. Local journalist Ernest Edwards, who was the sports editor of newspapers the Liverpool Daily Post and Echo, christened it the Spion Kop; it was named after a famous hill in South Africa where a local regiment had suffered heavy losses during the Boer War in 1900. More than 300 men had died, many of them from Liverpool, as the British army attempted to capture the strategic hilltop. Around the same period a stand was also built along Kemlyn Road.[12]
A statue in honour of Bill Shankly, which was erected in 1997 outside The Kop
The ground remained much the same until 1928, when the Kop was redesigned and extended to hold 30,000 spectators, all standing. A roof was erected as well.[13] Many stadia in England had stands named after the Spion Kop. Anfield's was the largest Kop in the country at the time—it was able to hold more supporters than some entire football grounds.[14] In the same year the topmast of the SS Great Eastern, one of the first iron ships, was rescued from the ship breaking yard at nearby Rock Ferry, and was hauled up Everton Valley by a team of horses, to be erected alongside the new Kop. It still stands there, serving as a flag pole.[15]
Floodlights were installed at a cost of £12,000 in 1957. On 30 October they were switched on for the first time for a match against Everton to commemorate the 75-year anniversary of the Liverpool County Football Association.[14] In 1963 the old Kemlyn Road stand was replaced by a cantilevered stand, built at a cost of £350,000, and able to hold 6,700 spectators.[16] Two years later alterations were made at the Anfield Road end, turning it into a large covered standing area. The biggest redevelopment came in 1973, when the old Main Stand was demolished and a new one constructed. At the same time, the pylon floodlights were pulled down and new lights installed along the top of the Kemlyn Road and Main Stands. The new stand was officially opened by the Duke of Kent on 10 March 1973.[16] In the 1980s the paddock in front of the Main Stand was turned into seating, and in 1982 seats were introduced at the Anfield Road end. The Shankly Gates were erected in 1982, a tribute to former manager Bill Shankly; his widow Nessie unlocked them for the first time on 26 August 1982.[15] Across the Shankly Gates are the words You'll Never Walk Alone, the title of the hit song by Gerry & The Pacemakers adopted by Liverpool fans as the club's anthem during Shankly's time as manager.[17]
Coloured seats and a police room were added to the Kemlyn Road stand in 1987. After the Hillsborough disaster in 1989 where overcrowding led to the deaths of 96 Liverpool fans, the Taylor Report recommended that all grounds in the country should be converted into all-seater grounds by May 1994.[18] A second tier was added to the Kemlyn Road stand in 1992, turning it into a double-decker layout. It included executive boxes and function suites as well as 11,000 seating spaces. Plans to expand the stand had been made earlier, with the club buying up houses on Kemlyn Road during the 1970s and 1980s, but had to be put on hold until 1990 because two sisters, Joan and Nora Mason, refused to sell their house. When the club reached an agreement with the sisters in 1990, the expansion plans were put into action.[19] The stand—renamed the Centenary Stand—was officially opened on 1 September 1992 by UEFA president Lennart Johansson. The Kop was rebuilt in 1994 after the recommendations of the Taylor Report and became all seated; it is still a single tier, and the capacity was significantly reduced to 12,390.[14]
On 4 December 1997, a bronze statue of Bill Shankly was unveiled at the visitors' centre in front of the Kop. Standing at over 8 feet (2.4 m) tall, the statue depicts Shankly with a fan's scarf around his neck, in a familiar pose he adopted when receiving applause from fans. Inscribed on the statue are the words "Bill Shankly – He Made The People Happy".[20] The Hillsborough memorial is situated alongside the Shankly Gates, and is always decorated with flowers and tributes to the 96 people who died in 1989 as a result of the disaster. At the centre of the memorial is an eternal flame, signifying that those who died will never be forgotten.[21] The most recent structural change to Anfield came in 1998 when the new two-tier Anfield Road end was opened. The stand has encountered a number of problems since its redevelopment; at the beginning of the 1999–2000 season, a series of support poles and stanchions had to be brought in to give extra stability to the top tier of the stand. During Ronnie Moran's testimonial match against Celtic, many fans complained of movement of the top tier. At the same time that the stanchions were inserted, the executive seating area was expanded by two rows in the main stand, lowering the seating capacity in the paddock.[22]
The stadium has four stands: the Spion Kop, Main Stand, Centenary Stand and Anfield Road. The record attendance of 61,905, was set at a match between Liverpool and Wolverhampton Wanderers in 1952. The ground's conversion to an all-seater stadium in 1994 as a result of the Taylor Report greatly reduced its capacity.
Two gates at the ground are named after former Liverpool managers: Bill Shankly and Bob Paisley. A statue of Shankly is situated outside the stadium. The ground is 2 miles (3 km) from Liverpool Lime Street railway station.
Plans to replace Anfield with a new 60,000-capacity stadium in adjacent Stanley Park were initiated in 2002. Fenway Sports Group's acquisition of Liverpool in 2010 made the construction of a new stadium doubtful as they have said they would prefer to redevelop Anfield.Opened in 1884, Anfield was originally owned by John Orrell, a minor land owner who was a friend of an Everton F.C. member John Houlding.[5] Everton, who previously played at Priory Road, were in need of a new venue owing to the noise produced by the crowd on match days.[6] Orrell lent the pitch to the club in exchange for a small rent. The first match at the ground was between Everton and Earlestown on 28 September 1884, which Everton won 5–0.[7] During Everton's tenure at the stadium, stands were erected for some of the 8,000-plus spectators regularly attending matches, although the ground was capable of holding around 20,000 spectators and occasionally did. The ground was considered of international standard at the time, playing host to the British Home Championship match between England and Ireland in 1889. Anfield's first league match was played on 8 September 1888, between Everton and Accrington F.C. Everton quickly improved as a team, and became Anfield's first league champions in the 1890–91 season.[8]
In 1892, negotiations to purchase the land at Anfield from Orrell escalated into a dispute between Houlding and the Everton F.C. committee over how the club was run. Events culminated in Everton's move to Goodison Park.[6] Houlding was left with an empty stadium, and decided to form a new club to occupy it. The new team was called Liverpool F.C. and Athletic Grounds Ltd, and the club's first match at Anfield was a friendly played in front of 200 people on 1 September 1892, against Rotherham Town. Liverpool won 7–1.[9]
Liverpool's first Football League match at Anfield was played on 9 September 1893, against Lincoln City. Liverpool won 4–0 in front of 5,000 spectators.[10] A new stand capable of holding 3,000 spectators was constructed in 1895 on the site of the present Main Stand. Designed by architect Archibald Leitch,[11] the stand had a distinctive red and white gable, and was similar to the main stand at Newcastle United's ground St James' Park.[9] Another stand was constructed at the Anfield Road end in 1903, built from timber and corrugated iron. After Liverpool had won their second League championship in 1906, a new stand was built along the Walton Breck Road. Local journalist Ernest Edwards, who was the sports editor of newspapers the Liverpool Daily Post and Echo, christened it the Spion Kop; it was named after a famous hill in South Africa where a local regiment had suffered heavy losses during the Boer War in 1900. More than 300 men had died, many of them from Liverpool, as the British army attempted to capture the strategic hilltop. Around the same period a stand was also built along Kemlyn Road.[12]
A statue in honour of Bill Shankly, which was erected in 1997 outside The Kop
The ground remained much the same until 1928, when the Kop was redesigned and extended to hold 30,000 spectators, all standing. A roof was erected as well.[13] Many stadia in England had stands named after the Spion Kop. Anfield's was the largest Kop in the country at the time—it was able to hold more supporters than some entire football grounds.[14] In the same year the topmast of the SS Great Eastern, one of the first iron ships, was rescued from the ship breaking yard at nearby Rock Ferry, and was hauled up Everton Valley by a team of horses, to be erected alongside the new Kop. It still stands there, serving as a flag pole.[15]
Floodlights were installed at a cost of £12,000 in 1957. On 30 October they were switched on for the first time for a match against Everton to commemorate the 75-year anniversary of the Liverpool County Football Association.[14] In 1963 the old Kemlyn Road stand was replaced by a cantilevered stand, built at a cost of £350,000, and able to hold 6,700 spectators.[16] Two years later alterations were made at the Anfield Road end, turning it into a large covered standing area. The biggest redevelopment came in 1973, when the old Main Stand was demolished and a new one constructed. At the same time, the pylon floodlights were pulled down and new lights installed along the top of the Kemlyn Road and Main Stands. The new stand was officially opened by the Duke of Kent on 10 March 1973.[16] In the 1980s the paddock in front of the Main Stand was turned into seating, and in 1982 seats were introduced at the Anfield Road end. The Shankly Gates were erected in 1982, a tribute to former manager Bill Shankly; his widow Nessie unlocked them for the first time on 26 August 1982.[15] Across the Shankly Gates are the words You'll Never Walk Alone, the title of the hit song by Gerry & The Pacemakers adopted by Liverpool fans as the club's anthem during Shankly's time as manager.[17]
Coloured seats and a police room were added to the Kemlyn Road stand in 1987. After the Hillsborough disaster in 1989 where overcrowding led to the deaths of 96 Liverpool fans, the Taylor Report recommended that all grounds in the country should be converted into all-seater grounds by May 1994.[18] A second tier was added to the Kemlyn Road stand in 1992, turning it into a double-decker layout. It included executive boxes and function suites as well as 11,000 seating spaces. Plans to expand the stand had been made earlier, with the club buying up houses on Kemlyn Road during the 1970s and 1980s, but had to be put on hold until 1990 because two sisters, Joan and Nora Mason, refused to sell their house. When the club reached an agreement with the sisters in 1990, the expansion plans were put into action.[19] The stand—renamed the Centenary Stand—was officially opened on 1 September 1992 by UEFA president Lennart Johansson. The Kop was rebuilt in 1994 after the recommendations of the Taylor Report and became all seated; it is still a single tier, and the capacity was significantly reduced to 12,390.[14]
On 4 December 1997, a bronze statue of Bill Shankly was unveiled at the visitors' centre in front of the Kop. Standing at over 8 feet (2.4 m) tall, the statue depicts Shankly with a fan's scarf around his neck, in a familiar pose he adopted when receiving applause from fans. Inscribed on the statue are the words "Bill Shankly – He Made The People Happy".[20] The Hillsborough memorial is situated alongside the Shankly Gates, and is always decorated with flowers and tributes to the 96 people who died in 1989 as a result of the disaster. At the centre of the memorial is an eternal flame, signifying that those who died will never be forgotten.[21] The most recent structural change to Anfield came in 1998 when the new two-tier Anfield Road end was opened. The stand has encountered a number of problems since its redevelopment; at the beginning of the 1999–2000 season, a series of support poles and stanchions had to be brought in to give extra stability to the top tier of the stand. During Ronnie Moran's testimonial match against Celtic, many fans complained of movement of the top tier. At the same time that the stanchions were inserted, the executive seating area was expanded by two rows in the main stand, lowering the seating capacity in the paddock.[22]
Wembley Stadium (often referred to simply as Wembley, pronounced /ˈwɛmbli/, or sometimes as the New Wembley) is a football stadium located in Wembley Park, in the Borough of Brent, London, England. It opened in 2007 and was built on the site of the previous 1923 Wembley Stadium. The earlier Wembley stadium, originally called the Empire Stadium, was often referred to as "The Twin Towers" and was one of the world's most famous football stadia until its demolition in 2003.[6]
It is a UEFA category four stadium. The 90,000-capacity venue (105,000 combined seating and standing) is the second largest stadium in Europe, and serves as England's national stadium. It is the home venue of the England national football team, and hosts the latter stages of the top level domestic club cup competition, the FA Cup. It is owned by English football's governing body, The Football Association (The FA), through their subsidiary Wembley National Stadium Ltd (WNSL).
Designed by Foster and Partners and HOK Sport (since renamed Populous), it includes a partially retractable roof. A signature feature of the stadium, following on from the old Wembley's distinctive Twin Towers, is the 134-metre-high (440 ft) Wembley Arch. With a span of 317 metres (1,040 ft), this steel arch is the longest single-span roof structure in the world and, uniquely for a stadium, requires beacons for low-flying aircraft. The stadium was built by Australian firm Multiplex at a cost of £798 million. The old Wembley closed in October 2000, with demolition originally intended for that December and the new stadium due to open in 2003. After delays to the project, with demolition first started in September 2002, the old Wembley was not completely demolished until February 2003, with the new stadium scheduled to open in time for the 2006 FA Cup Final. After further delays, the stadium was delivered nearly a year late, leading to legal disputes between WNSL and Multiplex, who ultimately made a significant loss on the project. The stadium was handed over on 9 March 2007, in time to host the 2007 FA Cup Final.
In international football, the stadium was a central component of the failed English 2018 and 2022 FIFA World Cup bids. In 2012 it hosted the football finals of the London Olympics. In club football, in addition to the FA Cup the stadium hosts the showpiece season-opening game the FA Community Shield match, played in August between the winners of the FA Cup and the top-level Premier League. In mid-season it also hosts the finals of the Football League Cup and Football League Trophy. At the end of the domestic season, the stadium also hosts the finals of the Football League play-offs. In European football, it hosted the 2011 Champions League Final, and will host the final again in 2013. In friendly tournaments, since 2009 it has been the venue of the summer Wembley Cup. Outside of football, the stadium also hosts major rugby league games, such as the Challenge Cup and International Rugby League. The stadium is also an annual regular season venue for the American National Football League's International Series, the first such venue outside North America. Non-sporting uses include large music concerts such as Concert for Diana, Live Earth and the Summertime Ball.Wembley was designed by architects Foster + Partners and Populous (known as HOK Sport at the time of the design phase and construction) and with engineers Mott Stadium Consortium, who were a collection of three structural engineering consultants in the form of Mott MacDonald Ltd, Sinclair Knight & Merz and Aurecon. The design of the building services was carried out by Mott MacDonald Ltd. The construction of the stadium was managed by Australian company Brookfield Multiplex and funded by Sport England, WNSL (Wembley National Stadium Limited), the Football Association, the Department for Culture Media and Sport and the London Development Agency. It is one of the most expensive stadia ever built at a cost of £798 million (After New Meadowlands Stadium)[7][8] and has the largest roof-covered seating capacity in the world. Nathaniel Lichfield and Partners was appointed to assist Wembley National Stadium Limited in preparing the scheme for a new stadium and to obtain planning and listed building permission for the development.[9]
Wembley Stadium interior
The all-seater stadium is based around a bowl design with a capacity of 90,000, protected from the elements by a sliding roof that does not completely enclose it. It can also be adapted as an athletic stadium by erecting a temporary platform over the lowest tier of seating.[10] The stadium's signature feature is a circular section lattice arch of 7 m (23 ft) internal diameter with a 315 m (1,033 ft) span, erected some 22° off true, and rising to 133 m (436 ft). It supports all the weight of the north roof and 60% of the weight of the retractable roof on the southern side.[11] The archway is the world's longest unsupported roof structure.[12] Instead of the 39 steps climbed, in the original stadium, to enter the Royal Box and collect a trophy, there are now 107.[13]
A "platform system" has been designed to convert the stadium for athletics use, but its use would decrease the stadium's capacity to approximately 60,000.[14] No athletics events (track and field) have taken place at the stadium, and none are scheduled.[citation needed] The conversion for athletics use was a condition of part of the lottery funding the stadium received, but to convert it would take weeks of work and cost millions of pounds.[15]
It is a UEFA category four stadium. The 90,000-capacity venue (105,000 combined seating and standing) is the second largest stadium in Europe, and serves as England's national stadium. It is the home venue of the England national football team, and hosts the latter stages of the top level domestic club cup competition, the FA Cup. It is owned by English football's governing body, The Football Association (The FA), through their subsidiary Wembley National Stadium Ltd (WNSL).
Designed by Foster and Partners and HOK Sport (since renamed Populous), it includes a partially retractable roof. A signature feature of the stadium, following on from the old Wembley's distinctive Twin Towers, is the 134-metre-high (440 ft) Wembley Arch. With a span of 317 metres (1,040 ft), this steel arch is the longest single-span roof structure in the world and, uniquely for a stadium, requires beacons for low-flying aircraft. The stadium was built by Australian firm Multiplex at a cost of £798 million. The old Wembley closed in October 2000, with demolition originally intended for that December and the new stadium due to open in 2003. After delays to the project, with demolition first started in September 2002, the old Wembley was not completely demolished until February 2003, with the new stadium scheduled to open in time for the 2006 FA Cup Final. After further delays, the stadium was delivered nearly a year late, leading to legal disputes between WNSL and Multiplex, who ultimately made a significant loss on the project. The stadium was handed over on 9 March 2007, in time to host the 2007 FA Cup Final.
In international football, the stadium was a central component of the failed English 2018 and 2022 FIFA World Cup bids. In 2012 it hosted the football finals of the London Olympics. In club football, in addition to the FA Cup the stadium hosts the showpiece season-opening game the FA Community Shield match, played in August between the winners of the FA Cup and the top-level Premier League. In mid-season it also hosts the finals of the Football League Cup and Football League Trophy. At the end of the domestic season, the stadium also hosts the finals of the Football League play-offs. In European football, it hosted the 2011 Champions League Final, and will host the final again in 2013. In friendly tournaments, since 2009 it has been the venue of the summer Wembley Cup. Outside of football, the stadium also hosts major rugby league games, such as the Challenge Cup and International Rugby League. The stadium is also an annual regular season venue for the American National Football League's International Series, the first such venue outside North America. Non-sporting uses include large music concerts such as Concert for Diana, Live Earth and the Summertime Ball.Wembley was designed by architects Foster + Partners and Populous (known as HOK Sport at the time of the design phase and construction) and with engineers Mott Stadium Consortium, who were a collection of three structural engineering consultants in the form of Mott MacDonald Ltd, Sinclair Knight & Merz and Aurecon. The design of the building services was carried out by Mott MacDonald Ltd. The construction of the stadium was managed by Australian company Brookfield Multiplex and funded by Sport England, WNSL (Wembley National Stadium Limited), the Football Association, the Department for Culture Media and Sport and the London Development Agency. It is one of the most expensive stadia ever built at a cost of £798 million (After New Meadowlands Stadium)[7][8] and has the largest roof-covered seating capacity in the world. Nathaniel Lichfield and Partners was appointed to assist Wembley National Stadium Limited in preparing the scheme for a new stadium and to obtain planning and listed building permission for the development.[9]
Wembley Stadium interior
The all-seater stadium is based around a bowl design with a capacity of 90,000, protected from the elements by a sliding roof that does not completely enclose it. It can also be adapted as an athletic stadium by erecting a temporary platform over the lowest tier of seating.[10] The stadium's signature feature is a circular section lattice arch of 7 m (23 ft) internal diameter with a 315 m (1,033 ft) span, erected some 22° off true, and rising to 133 m (436 ft). It supports all the weight of the north roof and 60% of the weight of the retractable roof on the southern side.[11] The archway is the world's longest unsupported roof structure.[12] Instead of the 39 steps climbed, in the original stadium, to enter the Royal Box and collect a trophy, there are now 107.[13]
A "platform system" has been designed to convert the stadium for athletics use, but its use would decrease the stadium's capacity to approximately 60,000.[14] No athletics events (track and field) have taken place at the stadium, and none are scheduled.[citation needed] The conversion for athletics use was a condition of part of the lottery funding the stadium received, but to convert it would take weeks of work and cost millions of pounds.[15]
The London Eye is a giant Ferris wheel situated on the banks of the River Thames in London, England. The entire structure is 135 metres (443 ft) tall and the wheel has a diameter of 120 metres (394 ft).
It is the tallest Ferris wheel in Europe, and the most popular paid tourist attraction in the United Kingdom, visited by over 3.5 million people annually.[4] When erected in 1999 it was the tallest Ferris wheel in the world, until surpassed first by the 160 m (520 ft) Star of Nanchang in 2006 and then the 165 m (541 ft) Singapore Flyer in 2008. Supported by an A-frame on one side only, unlike the taller Nanchang and Singapore wheels, the Eye is described by its operators as "the world's tallest cantilevered observation wheel".[5] It provides the highest public viewing point,[6] and is the 20th tallest structure, in London.
The London Eye, or Millennium Wheel, was officially called the British Airways London Eye and then the Merlin Entertainments London Eye. Since 20 January 2011, its official name is the EDF Energy London Eye[7] following a three-year sponsorship deal.
The London Eye adjoins the western end of Jubilee Gardens, on the South Bank of the River Thames between Westminster Bridge and Hungerford Bridge, in the London Borough of Lambeth. The site is adjacent to that of the former Dome of Discovery, which was built for the Festival of Britain in 1951.The London Eye was formally opened by the then Prime Minister, Tony Blair, on 31 December 1999, although it was not opened to the public until 9 March 2000 because of technical problems.[citation needed] Since its opening, the Eye has become a major landmark and tourist attraction.
Since 1 January 2005, the Eye has been the focal point of London's New Year celebrations, with 10-minute displays taking place involving fireworks fired from the wheel itself.[citation needed]
In 2006 the Tussauds Group bought out the other two joint owners, British Airways and the Marks Barfield family (the lead architects).[19] Following Merlin Entertainments' purchase of the Tussauds Group in 2007, it now owns 100% of the Eye. British Airways continued its brand association, but from the beginning of 2008 the name 'British Airways' was dropped from the logo.
On 12 August 2009 the London Eye saw another rebrand, this time being called "The Merlin Entertainments London Eye" to show Merlin Entertainments' ownership. A new logo was designed for the attraction—this time taking the actual form of an eye made out of London's famous landmarks. This also came at the time when the new Merlin Entertainments London Eye 4D Experience preflight show was launched underneath the ticket centre in County Hall.[20]uring the bidding process of the 2012 Olympic Games, the London bid organisers announced the Olympic emblem would be attached to the Eye for the duration of the 2012 Summer Olympics.[21]
On 5 June 2008 it was announced that 30 million people had ridden the London Eye since its opening in March 2000.[22]
In 2009 Merlin Entertainments opened a preflight 4D Experience at The London Eye, which is included in the ticket price. The newly refurbished ticket hall and 4D cinema experience was designed by architect Kay Elliott working with Merlin Studios project designer Craig Sciba. Merlin Studios later appointed Simex-Iwerks as the 4D theatre hardware specialists. The film was written and directed by 3D director Julian Napier and 3D produced by Phil Streather. The same year the first stage of a £12.5 million capsule upgrade started. Each capsule was taken down and floated down the river to Tilbury Docks in Essex.[23]
In January 2011, a lighting-up ceremony marked the start of a three-year deal between nuclear company EDF Energy and Merlin Entertainment. Merlin said EDF would help it reduce the London Eye's overall carbon footprint using its expertise as the UK's largest producer of low-carbon electricity
It is the tallest Ferris wheel in Europe, and the most popular paid tourist attraction in the United Kingdom, visited by over 3.5 million people annually.[4] When erected in 1999 it was the tallest Ferris wheel in the world, until surpassed first by the 160 m (520 ft) Star of Nanchang in 2006 and then the 165 m (541 ft) Singapore Flyer in 2008. Supported by an A-frame on one side only, unlike the taller Nanchang and Singapore wheels, the Eye is described by its operators as "the world's tallest cantilevered observation wheel".[5] It provides the highest public viewing point,[6] and is the 20th tallest structure, in London.
The London Eye, or Millennium Wheel, was officially called the British Airways London Eye and then the Merlin Entertainments London Eye. Since 20 January 2011, its official name is the EDF Energy London Eye[7] following a three-year sponsorship deal.
The London Eye adjoins the western end of Jubilee Gardens, on the South Bank of the River Thames between Westminster Bridge and Hungerford Bridge, in the London Borough of Lambeth. The site is adjacent to that of the former Dome of Discovery, which was built for the Festival of Britain in 1951.The London Eye was formally opened by the then Prime Minister, Tony Blair, on 31 December 1999, although it was not opened to the public until 9 March 2000 because of technical problems.[citation needed] Since its opening, the Eye has become a major landmark and tourist attraction.
Since 1 January 2005, the Eye has been the focal point of London's New Year celebrations, with 10-minute displays taking place involving fireworks fired from the wheel itself.[citation needed]
In 2006 the Tussauds Group bought out the other two joint owners, British Airways and the Marks Barfield family (the lead architects).[19] Following Merlin Entertainments' purchase of the Tussauds Group in 2007, it now owns 100% of the Eye. British Airways continued its brand association, but from the beginning of 2008 the name 'British Airways' was dropped from the logo.
On 12 August 2009 the London Eye saw another rebrand, this time being called "The Merlin Entertainments London Eye" to show Merlin Entertainments' ownership. A new logo was designed for the attraction—this time taking the actual form of an eye made out of London's famous landmarks. This also came at the time when the new Merlin Entertainments London Eye 4D Experience preflight show was launched underneath the ticket centre in County Hall.[20]uring the bidding process of the 2012 Olympic Games, the London bid organisers announced the Olympic emblem would be attached to the Eye for the duration of the 2012 Summer Olympics.[21]
On 5 June 2008 it was announced that 30 million people had ridden the London Eye since its opening in March 2000.[22]
In 2009 Merlin Entertainments opened a preflight 4D Experience at The London Eye, which is included in the ticket price. The newly refurbished ticket hall and 4D cinema experience was designed by architect Kay Elliott working with Merlin Studios project designer Craig Sciba. Merlin Studios later appointed Simex-Iwerks as the 4D theatre hardware specialists. The film was written and directed by 3D director Julian Napier and 3D produced by Phil Streather. The same year the first stage of a £12.5 million capsule upgrade started. Each capsule was taken down and floated down the river to Tilbury Docks in Essex.[23]
In January 2011, a lighting-up ceremony marked the start of a three-year deal between nuclear company EDF Energy and Merlin Entertainment. Merlin said EDF would help it reduce the London Eye's overall carbon footprint using its expertise as the UK's largest producer of low-carbon electricity
Big Ben is the nickname for the great bell of the clock at the north end of the Palace of Westminster in London,[1] and often extended to refer to the clock and the clock tower, officially named Elizabeth Tower, as well.[2] Elizabeth Tower holds the largest four-faced chiming clock in the world and is the third-tallest free-standing clock tower.[3] It celebrated its 150th anniversary on 31 May 2009,[4] during which celebratory events took place.[5][6] The tower was completed in 1858 and has become one of the most prominent symbols of both London and England, often in the establishing shot of films set in the city.The clock's movement is famous for its reliability. The designers were the lawyer and amateur horologist Edmund Beckett Denison, and George Airy, the Astronomer Royal. Construction was entrusted to clockmaker Edward John Dent; after his death in 1853 his stepson Frederick Dent completed the work, in 1854.[18] As the Tower was not complete until 1859, Denison had time to experiment: Instead of using the deadbeat escapement and remontoire as originally designed, Denison invented the double three-legged gravity escapement. This escapement provides the best separation between pendulum and clock mechanism. The pendulum is installed within an enclosed windproof box sunk beneath the clockroom. It is 13 feet (4.0 m) long, weighs 660 pounds (300 kg) and beats every 2 seconds. The clockwork mechanism in a room below weighs 5 tons. On top of the pendulum is a small stack of old penny coins; these are to adjust the time of the clock. Adding a coin has the effect of minutely lifting the position of the pendulum's centre of mass, reducing the effective length of the pendulum rod and hence increasing the rate at which the pendulum swings. Adding or removing a penny will change the clock's speed by 0.4 seconds per day.[6]
On 10 May 1941, a German bombing raid damaged two of the clock's dials and sections of the tower's stepped roof and destroyed the House of Commons chamber. Architect Sir Giles Gilbert Scott designed a new five-floor block. Two floors are occupied by the current chamber, which was used for the first time on 26 October 1950. Despite the heavy bombing the clock ran accurately and chimed throughout the Blitz.
On 10 May 1941, a German bombing raid damaged two of the clock's dials and sections of the tower's stepped roof and destroyed the House of Commons chamber. Architect Sir Giles Gilbert Scott designed a new five-floor block. Two floors are occupied by the current chamber, which was used for the first time on 26 October 1950. Despite the heavy bombing the clock ran accurately and chimed throughout the Blitz.
The Allianz Arena is a football stadium in the north of Munich, Bavaria, Germany. The two professional Munich football clubs FC Bayern Munich and TSV 1860 München have played their home games at the Allianz Arena since the start of the 2005–06 season. Both clubs had previously played their home games at the Munich Olympic Stadium since 1972, where FC Bayern Munich played all of their games and TSV 1860 München most of their games. The Allianz Arena is the third biggest stadium in Germany behind Signal Iduna Park in Dortmund and the Olympiastadion in Berlin.
The large financial services provider Allianz purchased the rights to name the stadium for 30 years. However this name cannot be used when hosting FIFA and UEFA events, since these governing bodies have policies forbidding corporate sponsorship from companies that are not official tournament partners. During the 2006 World Cup, the stadium was referred to as FIFA World Cup Stadium Munich. In UEFA club matches, it is known as Fußball Arena München, and it hosted the 2012 UEFA Champions League Final.[1] The stadium has been nicknamed "Schlauchboot" (inflatable boat).[2][3]On 21 October 2002 voters went to the polls to determine whether a new stadium should be built in this location and whether the city of Munich should provide the necessary infrastructure. About two thirds of the voters decided in favor of the proposition. An alternative to constructing the new arena had been a major reconstruction of the Olympic Stadium but this option had been refused by its architect Günther Behnisch.
The Swiss architect firm of Herzog & de Meuron then developed the concept of the stadium with a see-through exterior made of ETFE-foil panels, that can be lit from the inside and are self-cleaning. Construction started in the autumn of 2002 and was completed by the end of April 2005.
The Fröttmaning and Marienplatz stations of the subway line U6 were expanded and improved in conjunction with the arena construction. The Fröttmaning subway station was expanded from two to four tracks, while the Marienplatz U-Bahn station was outfitted with additional pedestrian connector tunnels running parallel to the subway tracks, which lead towards the S-Bahn portion of the station, lessening congestion among passengers making connections to the Munich S-Bahn. To be able to handle the additional traffic load, the Autobahn A9 was expanded to three and four lanes going each way and another exit was added to the A99 north of the arena.
On 19 May 2012, the 2011–12 UEFA Champions League final was held at the Allianz Arena. Bayern Munich, who were drawn as home team, was set to play against Chelsea. Chelsea won on penalties after the game had tied 1–1 after regulation and extra time. Bastian Schweinsteiger's penalty hit Petr Cech's left post, and Didier Drogba swept home the winning penalty.
On 29 August 2012, Bayern Munich announced that there are an additional 2,000 seats.[6] The capacity for domestic matches increases to 71,000 and UEFA Champions League and International matches increases to 68,000.[6]
The large financial services provider Allianz purchased the rights to name the stadium for 30 years. However this name cannot be used when hosting FIFA and UEFA events, since these governing bodies have policies forbidding corporate sponsorship from companies that are not official tournament partners. During the 2006 World Cup, the stadium was referred to as FIFA World Cup Stadium Munich. In UEFA club matches, it is known as Fußball Arena München, and it hosted the 2012 UEFA Champions League Final.[1] The stadium has been nicknamed "Schlauchboot" (inflatable boat).[2][3]On 21 October 2002 voters went to the polls to determine whether a new stadium should be built in this location and whether the city of Munich should provide the necessary infrastructure. About two thirds of the voters decided in favor of the proposition. An alternative to constructing the new arena had been a major reconstruction of the Olympic Stadium but this option had been refused by its architect Günther Behnisch.
The Swiss architect firm of Herzog & de Meuron then developed the concept of the stadium with a see-through exterior made of ETFE-foil panels, that can be lit from the inside and are self-cleaning. Construction started in the autumn of 2002 and was completed by the end of April 2005.
The Fröttmaning and Marienplatz stations of the subway line U6 were expanded and improved in conjunction with the arena construction. The Fröttmaning subway station was expanded from two to four tracks, while the Marienplatz U-Bahn station was outfitted with additional pedestrian connector tunnels running parallel to the subway tracks, which lead towards the S-Bahn portion of the station, lessening congestion among passengers making connections to the Munich S-Bahn. To be able to handle the additional traffic load, the Autobahn A9 was expanded to three and four lanes going each way and another exit was added to the A99 north of the arena.
On 19 May 2012, the 2011–12 UEFA Champions League final was held at the Allianz Arena. Bayern Munich, who were drawn as home team, was set to play against Chelsea. Chelsea won on penalties after the game had tied 1–1 after regulation and extra time. Bastian Schweinsteiger's penalty hit Petr Cech's left post, and Didier Drogba swept home the winning penalty.
On 29 August 2012, Bayern Munich announced that there are an additional 2,000 seats.[6] The capacity for domestic matches increases to 71,000 and UEFA Champions League and International matches increases to 68,000.[6]
The Stadio Giuseppe Meazza, commonly known as San Siro, is a football stadium located in the San Siro district in Milan, Italy. It is the home of both Associazione Calcio Milan and Football Club Internazionale Milano. On 3 March 1980,[2] the stadium was named in honour of Giuseppe Meazza, the two-time World Cup winner (1934, 1938) who played for Internazionale, and briefly for Milan, in the 1930s and 1940s. It held UEFA five-star stadium status which was superseded by a new system of classification.Construction of the stadium commenced in 1925 in the district of Milan named San Siro, with the new stadium originally named "Nuovo Stadio Calcistico San Siro" (San Siro New Football Stadium).[3] The idea to build a stadium in the same district as the horse racing track, belongs to the man who then was the president of AC Milan, Piero Pirelli. The architects designed a private stadium only for football, without the athletics tracks which characterized the Italian stadia built with public funds.[4] The inauguration was on September 19, 1926, when 35,000 spectators saw Internazionale defeat Milan 6–3. Originally, the ground was home and property of AC Milan. In 1947 Internazionale became tenants and the two have shared the ground ever since.
As well as being used by Milan and Inter, the Italian national team also plays occasional games there and it has also been used for the 1965, 1970, and 2001 UEFA Champions League finals. The stadium was also used for Internazionale's UEFA Cup finals when played over home and away legs but has never featured since the competition changed to a single final structure in 1997–98.
The stadium underwent further renovations for the 1990 World Cup with $60 million being spent, bringing the stadium up to UEFA category four standard. As part of the renovations, the stadium became all seated, with an extra tier being added to three sides of the stadium. This entailed the building of 11 concrete towers around the outside of the stadium. Four of these concrete towers were being located at the corners to support a new roof which has distinctive protruding red girders.
Inter is in the process of new stadium feasibility studies.
The first Rugby Union international at the San Siro took place when Italy played New Zealand national rugby union team in the 2009 end of year rugby tests
As well as being used by Milan and Inter, the Italian national team also plays occasional games there and it has also been used for the 1965, 1970, and 2001 UEFA Champions League finals. The stadium was also used for Internazionale's UEFA Cup finals when played over home and away legs but has never featured since the competition changed to a single final structure in 1997–98.
The stadium underwent further renovations for the 1990 World Cup with $60 million being spent, bringing the stadium up to UEFA category four standard. As part of the renovations, the stadium became all seated, with an extra tier being added to three sides of the stadium. This entailed the building of 11 concrete towers around the outside of the stadium. Four of these concrete towers were being located at the corners to support a new roof which has distinctive protruding red girders.
Inter is in the process of new stadium feasibility studies.
The first Rugby Union international at the San Siro took place when Italy played New Zealand national rugby union team in the 2009 end of year rugby tests
Red Star Stadium is a multi-use stadium in Belgrade, Serbia. It is currently used mostly for football matches and is the home stadium of Red Star Belgrade. The stadium is all-seated and the capacity is 55,538.[1] A sold-out Red Star Stadium has always been known as a very tough ground for visitors.The first football stadium in this location was constructed in 1927. It was the stadium of SK Jugoslavija. It consisted of a 30,000 capacity stadium with grass pitch, athletic track, training facility and club house. SK Jugoslavija played its matches on the stadium until the end of the Second World War when the club was disbanded by the new Yugoslav authorities. The ground was signed over to the newly founded club Red Star Belgrade.After three years of construction, the new stadium was ready to be unveiled. The official opening took place on 1 September 1963 with the Yugoslav First League match against NK Rijeka (2:1). That day, some 55,000 spectators came through 9 entrance gates of 5 metres width each into the still unfinished stands. The very first visitor to the stadium is known to be Laza Petrović, a peasant from the Loznica vicinity. This fiery Red Star fan arrived to the new stadium early in the morning and took his place in the eastern stand. He took out cheese and a bannock from his bag, then ate his breakfast while he waited patiently until the late afternoon for the game to start.
The largest crowd was recorded that autumn at a derby against Partizan Belgrade – 108,000 people. Next year, after the stadium was fully completed its capacity increased to 110,000 spectators and it got the unofficial moniker - Marakana, in honour of the famous Brazilian stadium. Apart from the exciting look, the new stadium also featured a magnificent grass pitch with drainage, which made the overall playing experience much more enjoyable.
The first official goal at the stadium was scored by Trifun Mihailović in a youth match between Red Star and Jedinstvo from Zemun, a prelude to the first league match with NK Rijeka. The first official top division goal was scored by Nedeljko Vukoje from Rijeka while Dušan Maravić scored Red Star's first ever goal at the stadium, which resulted in a draw in the same game.
Still on the subject of records, according to the number of tickets sold, the stadium saw its largest crowd on 23 April 1975 at the Cup Winners Cup semi-final home leg against the Hungarian side Ferencváros 2–2. There were officially 96,070 spectators in the stands that night with purchased tickets, but it is believed that the stadium was filled to the maximum allowable capacity which at the time was 110,000.
In the years since, the stadium's capacity has gradually decreased. Following different modernization touch-ups, more seats were added. During the mid 1990s, in order to meet UEFA demands for spectators' comfort and security, standing places at the stadium were completely done away with. Seats were installed on all 4 stands so that the stadium‘s maximum capacity was 60,000.
In 2008, the club announced the reconstruction of the pitch in the stadium. Under-soil grass heaters were installed and new modern turf has replaced the old playing surface. The training pitch will also be renovated by laying down synthetic turf and installing new lighting equipment.
The largest crowd was recorded that autumn at a derby against Partizan Belgrade – 108,000 people. Next year, after the stadium was fully completed its capacity increased to 110,000 spectators and it got the unofficial moniker - Marakana, in honour of the famous Brazilian stadium. Apart from the exciting look, the new stadium also featured a magnificent grass pitch with drainage, which made the overall playing experience much more enjoyable.
The first official goal at the stadium was scored by Trifun Mihailović in a youth match between Red Star and Jedinstvo from Zemun, a prelude to the first league match with NK Rijeka. The first official top division goal was scored by Nedeljko Vukoje from Rijeka while Dušan Maravić scored Red Star's first ever goal at the stadium, which resulted in a draw in the same game.
Still on the subject of records, according to the number of tickets sold, the stadium saw its largest crowd on 23 April 1975 at the Cup Winners Cup semi-final home leg against the Hungarian side Ferencváros 2–2. There were officially 96,070 spectators in the stands that night with purchased tickets, but it is believed that the stadium was filled to the maximum allowable capacity which at the time was 110,000.
In the years since, the stadium's capacity has gradually decreased. Following different modernization touch-ups, more seats were added. During the mid 1990s, in order to meet UEFA demands for spectators' comfort and security, standing places at the stadium were completely done away with. Seats were installed on all 4 stands so that the stadium‘s maximum capacity was 60,000.
In 2008, the club announced the reconstruction of the pitch in the stadium. Under-soil grass heaters were installed and new modern turf has replaced the old playing surface. The training pitch will also be renovated by laying down synthetic turf and installing new lighting equipment.